Reference detailSpinozaweg – Molenvliet tram line reconstructionRotterdam NLD2016 tramOCL

Renovation of tramway track.

  • Replacement of current tensioning mechanism by Tensorex tension mechanism
  • Disconnectors replacement
  • Installation of surge arresters
  • Regulation of OCL
  • Poles anchoring
  • Dismantling of old and installation of new OCL
  • section insulators replacement
Reference detailReconstruction of the station Horažďovice předměstíHorazdovice predmesti CZE 2015
 2016
 railOCL
SIG

Elektroline a.s. was responsible for complete delivery and assembly overhead contact line system 25 kV AC (ARCAS-EL); remote control of sectional disconnectors; low and medium voltage technologies, railway station lighting; delivery and assembly substations 27/2x0,2 kV for station interlocking systems, 25/0,4 kV for electric heating systems and 25/3kV for electrical pre-heating equipment for railway vehicles and wagons, delivery and assembly of electric switch heating system (ESHS) and remote control and monitoring of railway station lighting and ESHS at the station Horažďovice předměstí.

Reference detailRevitalization of the railway Trutnov – Teplice nad Metují Adrspach CZE2015 railSIG

Elektroline a.s. was responsible for complete delivery and assembly of automatic Electrical Heating of Switches System (EHS) at the station Adršpach and remote control and monitoring from station Teplice nad Metují.

Reference detailVojvode Stepe ReconstructionBelgrade SRB2015 tramOCL

Delivery of overhead contact line material for the reconstruction of tram catenary track in length of 3.5 km. 

Reference detailDevelopment of the ecological transport in municipality CraiovaCraiova ROU2015 tramOCL

Scope of work performed by Elektroline:

  • full installation of Tramway overhead contact network in total length of 15,6 km single line
  • Installation of overvoltage protection for the OCL 
  • delivery of OCL material
Reference detailReconstruction of the railway Klatovy – Železná Ruda Klatovy – Zelezna Ruda  CZE2015 railSIG

Elektroline a.s. was responsible for complete delivery and assembly of automatic Electrical Heating of Switches System (EHS) in 6 railway stations (Janovice nad Úhlavou, Nýrsko, Zelená Lhota, Hamry - Hojsova Stráž, Špičák, Železná Ruda – Alžbětín), and remote control and monitoring from station Železná Ruda - Alžbětín

Reference detailRehabilitation of Tramway route 101Ploiesti ROU2015 tramOCL

Increasing of public transport mobility by rehabilitation of tramway route 101 with works targeting the railway, stations with platforms adapted for persons with disabilities, tramways, elements for traffic signalization and automatization – phase II

Scope of work performed by Elektroline:

  • full installation of Tramway overhead contact network in total length of 7,7 km single line.
  • installation of overvoltage protection for the OCL
  • delivery of OCL material


Reference detailStara Zagora TBUS Switches VETRA LightStara Zagora BGR2015 tbusOCL
SIG

Delivery of trolleybus switches with VETRA Light Technology including vehicle equipment (assembly and supervision).

Reference detailTunis Marine Terminal Tunis TUN2015 tramSIG

Delivery yof SIL3 signaling and automatic control system (via TWC) for two electrical switch points at Terminus station (entry and exit to the depot); 14 pcs of resonant truck circuits; remote dispatcher office

Reference detailMelbourne (Control Systems)Melbourne AUS 2014
 2015
 tramSIG

Elektroline has installed tramway switch control systems (tramway signaling system) within Melbourne tramway network including BRC resonant track circuits for fail-safe detection of trams.

Within the time period since June 2014 till June 2015, Elektroline has delivered in total 12 switch control systems (TSC type, SIL3 safety level).

Reference detailInfrastracture Design and Overhead contact Line (Tramline nr. 4)Tallinn EST 2014
 2015
 tramOCL

Elektroline a.s. was responsible for the whole part of tramway catenary system, i. e. for design OCL, delivery of all the material of overhead contact line system, and its assembly.

Reference detailÚsti nad OrlicíÚsti nad Orlicí CZE 2013
 2015
 railOCL

Elektroline Inc. was responsible for delivery and assembly of overhead contact line system, remote control of sectional disconnectors, high-voltage substation, lithing in pedestrian underpass, heavy current wiring, electrical heating of switches and more.

Reference detailElektričková trať Dúbravka v úseku Hanulova - Pri krížiBratislava SVK2014 tramSIG

Delivery and installation of Electro-hydraulic point machine including control system TSC Tandem. We also installed electrical heating of switches and vehicle departure control from turnabout.

Reference detailBaross square projectBudapest HUN2014 tbusOCL

Delivery of TBUS OCL material for trolleybus track e.g. cantilevers, section insulators, curve clamps, crossings, etc. We also supervised the assembly of tbus line. 

Reference detailViale AmendolaLa Spezia ITA2014 tbusOCL

Dismantle of current cantilevers and delivery and installation of new cantilevers incl. suspended OCL material for trolleybus track.