Reference detailAdelaideAdelaide AUS 2006
 2007
 tramOCL

Material supply for 5 km TRAM track; Cooperation on the project together with SKM company.

Reference detailRevitalization of the railway Trutnov – Teplice nad Metují Adrspach CZE2015 railSIG

Elektroline a.s. was responsible for complete delivery and assembly of automatic Electrical Heating of Switches System (EHS) at the station Adršpach and remote control and monitoring from station Teplice nad Metují.

Reference detailTRAM Depot LekstraatAmsterdam NLD 2010
 2011
 tramSIG

Project description:

  • semi-automatic depot control system
  • automatic washing management system
  • custom-made real-time visualization
  • including fail-safe track circuits BRC


Reference detailAssembly of tbus line - Burgers' ZOO projectsArnhem NLD2012 tbusOCL

Assembly of single track tbus line in lenght of 1.5km including end loop at Burgers' ZOO entry area. We also designed and delivered one complete set of tbus crossing 85° with insulation in both passing directions. Assembly of two complete sets of disconnectors including automatic power supply disconnecting control and further we also delivered the signalling of no voltage status.

Reference detailAthens - tbus VETRA systemAthens GRC 2008
 2009
 tbusOCL
SIG

Deliveries and supervising of components and technologies for trolley-bus track, namely:

  • VETRA system - inteligent automatic setting of vehicle's itinerary while passing the city (vehicle's itinerary is automaticly performed until terminus arrival)
  • 50 complete sets of electrical switches
  • 60 complete sets of mechanical switches
  • 60 complete sets of tbus crossings
  • on board equipment of 366 vehicles by VETRA system
  • other OCL and fitting material
Reference detailVoula tram lineAthens GRC2007 tramOCL
SIG

Extension of current tram line. Delivery and installation of signaling systems and components. Supply and assembly of over-head contact line (OCL). Nonstop online support by trained Elektroline personnel.

Delivery and installation especially:

  • switch point control systems
  • point machines (electro-hydraulic and mechanical)
  • signaling lamps
  • cantilevers
  • tensioning mechanism
  • contact wire clamps

Reference: 

„(...) the final result fully met the technical specifications of the project as well as they met our expectations. (...) we would like to recommend Elektroline a.s. as an excellent option for executing this type of works. (...)“

Reference detailVojvode Stepe ReconstructionBelgrade SRB2015 tramOCL

Delivery of overhead contact line material for the reconstruction of tram catenary track in length of 3.5 km. 

Reference detailBendigoBendigo AUS2004 tramSIG

Delivery and installation:


  • Switch point control systems (2 switch points)

Maintenance:


  • Nonstop online support by trained Elektroline personnel





Reference detailOCL repair of lightrail track in BergenBergen NOR2012 tramOCL

Delivery of OCL material and adjustment of 10 kms lightrailtrack. Especially reparation and contact wire stagger adjustment of lightrail track (10kms) in tunnel.

Reference detailRegulation of OCLBergen NOR2011 tramOCL

Delivery of OCL material for regulation of OCL high. Regulation of overhead contact line (catenary system) in horizontal and also in vertical direction. Assembly in total length of 1800m double track including 700m in tunnel.

Reference detailBergenBergen NOR 2003
 2004
 tbusOCL

Material supply, assmebly of TBUS line including crosses and switches

Reference detailBlackpool and Fleetwood tramway reconstructionBlackpool GBR 2009
 2011
 tramSIG

Delivery and installation:

  • Switch point control systems TSC (SIL 3)
  • Point machines (electro-hydraulic and mechanical)
  • Radio communication system (VETRA communciation)
  • Preference of trams at junctions (VETRA communication)

Reference detailBordeauxBordeaux FRA2006 tramOCL

Assembly and installation at the project of Expansion of current tramway depot

Reference detailElektričková trať Dúbravka v úseku Hanulova - Pri krížiBratislava SVK2014 tramSIG

Delivery and installation of Electro-hydraulic point machine including control system TSC Tandem. We also installed electrical heating of switches and vehicle departure control from turnabout.

Reference detailBrusselsBrussels BEL 2007
 2011
 tramSIG

Delivery and installation:


  • Point machines (electro-hydraulic and mechanical)
  • Nonstop online support by trained Elektroline personnel