Reference detailMelbourne (Control Systems)Melbourne AUS 2014
 2015
 tramSIG

Elektroline has installed tramway switch control systems (tramway signaling system) within Melbourne tramway network including BRC resonant track circuits for fail-safe detection of trams.

Within the time period since June 2014 till June 2015, Elektroline has delivered in total 12 switch control systems (TSC type, SIL3 safety level).

Reference detailGold Coast Light RailGold Coast AUS 2012
 2013
 tramOCL

Delivery of the complete system of over head contact line material for 13km light trail track.

Reference detailMelbourne, track circuitsMelbourne AUS2011 tramSIG

Delivery and installation:

  • Delivery of fail-safe track circuits BRC for detecting presence of a tram within tram stops
  • Including GSM communication module for remote diagnostics of the system
Reference detailMelbourne Kew DepotMelbourne AUS2007 tramOCL

Material supply of overhead contact line line in depot

Reference detailAdelaideAdelaide AUS 2006
 2007
 tramOCL

Material supply for 5 km TRAM track; Cooperation on the project together with SKM company.

Reference detailBendigoBendigo AUS2004 tramSIG

Delivery and installation:


  • Switch point control systems (2 switch points)

Maintenance:


  • Nonstop online support by trained Elektroline personnel





Reference detailMelbourneMelbourne AUS2004 tramOCL
SIG

Delivery and installation:


  • Switch point control system (1 switch point)
  • Material delivery for Overhead Contact Line
  • Nonstop online support by trained Elektroline personnel



Reference detailSalzburgSalzburg AUT2009 tbusOCL

Delivery and installation:

  • Delivery of electrical and mechanical switches for trolley-bus track
  • Delivery of TBUS x TRAIN crossing where the vehicles can passage through with current in both ways (both trolley-bus as well as train)


Reference detailBrusselsBrussels BEL 2007
 2017
 tramSIG

Delivery and installation:


  • Point machines (more than 150 pcs of electro-hydraulic and over 200 of mechanical); 
  • Nonstop online support by trained Elektroline personnel



Reference detailGhent Langevelden level crossing signaling systemGhent BEL2012 tramSIG

Description of responsibilities:

  • SIL3 signaling system for tramway level crossing
  • SIL3/SIL2 resonant track circuits
Reference detailGhent, Switch pointGhent BEL 2008
 2010
 tramSIG


Delivery and Installation:
  • Switch point control system
  • Point machine (electro-hydraulic)
Nonstop online support by trained Elektroline staff






Reference detailStara Zagora TBUS Switches VETRA LightStara Zagora BGR2015 tbusOCL
SIG

Delivery of trolleybus switches with VETRA Light Technology including vehicle equipment (assembly and supervision).

Reference detailVidin Bridge II, Vidin Calafat, Part: Catenary, Part: ElektricityVidin BGR 2011
 2013
 railOCL
SIG

Elektroline Inc. was responsible for delivery and assembly of railway overhead contact line system (ARCAS) incl. remote control of sectional disconnectors.


Elektroline Inc. was responsible for delivery and assembly of electricity on the Bridge – LV and MV technology  incl. cabling, bridge highway and architecture lighting, power station 20/0,4 kV and bridge lightning protection.


Reference detailDanube Bridge and Adjoining Infrastructure ProjectVidin BGR 2009
 2012
 railOCL

Delivery and installation of electrical and OCL equipment including ARCAS system (15 km). Our main responsibility in the project is to build complete over-head contact line for rail traffic, illumination of railway stations & nearby road overpasses and traction substation 27,5 kV.


Danube Bridge and Adjoining Infrastructure Project is very significant rail-route construction in region of Eastern Europe. This bridge will become new transit connection between Bulgaria (Vidin) and Romania (Calafat). Until now it was not possible to cross the Danube River another way than by the ferry or hundreds kilometers far away bridges. It will be changed within several months. The importance of the bridge also consists in that matter it connects rail as well as road traffic. Our main responsibility in the project is to build complete over-head contact line for rail traffic, illumination of railway stations and traction substation 27,5 kV. We are very glad we can be part of such a project.  


Reference detailSofia control systemsSofia BGR 2005
 2008
 tramSIG

Elektroline Inc. has executed the delivery and installing of automatic control systems TMPKM for tram switches in the city of Sofia.