Reference detailBrusselsBrussels BEL 2007
 2017
 tramSIG

Delivery and installation:


  • Point machines (more than 150 pcs of electro-hydraulic and over 200 of mechanical); 
  • Nonstop online support by trained Elektroline personnel



Reference detailBydgoszczBydgoszcz POL 2007
 2017
 tramSIG

Delivery and installation of signaling systems including signaling components, especially:

  • point machine TSH 106 LC (SIL3) - 40 pcs
  • mechanical point machine - over 40 pcs
Reference detailTRAM Warsaw ProjectsWarsaw POL 1999
 2014
 tramOCL
SIG

Elektroline was responsible for delivery of TRAM OCL material and signaling components for the Warszawa city. We supplied especially following products:

  • TMPK and TSC control systems (more than 200 pcs)
  • signaling lamps
  • sleeves and pole fastening
  • supporting and tensioning equipment 
  • section insulators and OCL insulators
  • GRP cantilevers and their components
  • contact wire clamps
  • tensioning mechanism and weights
  • disconnectors
  • suspensions and various OCL holders


Reference detailGeneral OCS & SIGNALING Delivery for PraguePrague CZE 1992
 2014
 tramOCL
SIG

More than 20 years cooperation (assembly & installations, material delivery and regular maintainance of our signaling devices, electro-revisions) with Prague Transport Authority. We have delivered and installed e.g.:

SIGNALING:

  • Automatic control system for switches (more than 220 pcs)
  • Automatic heating system for switchpoints

OCL SYSTEMS:

  • TRAM section insulators
  • TRAM disconnectors
  • GRP cantilevers
  • Components for cantilevers
  • contact wire clamps 
  • tensioning mechanism
Reference detailIII. transit corridor Stribro - PlanaStribro, Plana CZE 2008
 2011
 railOCL

ELEKTROLINE a.s. was responsible for delivery and installing of material for   lighting, remote control of disconnectors and remote control of switch heating and lighting

Reference detailSzeged Pulz DepotSzeged HUN 2008
 2011
 tramSIG


Delivery and installation:
  • Switch point control systems
  • Point machines (electro-hydraulic 106 NN and mechanical)
  • Switch point heating
  • Atypical intersection control system
  • Special control system for switch points in depot
  • Overhead Contact Line



Reference detailThe HagueThe Hague NLD 2008
 2011
 tramSIG

Delivery and installation:

  • switch point control systems (SIL 3)
  • point machines (electro-hydraulic)


Reference detailMilanMilan ITA 2007
 2011
 tbusOCL

Material supply, site management in assembly of electrical TBUS switches. 

  • delivery of 40 complete sets of electrical switches with radio remote control
Reference detailGoteborg tramway signalingGöteborg SWE 2005
 2011
 tramSIG

Delivery:

  • track circuits BRC (new generation safety assessed track circuits)
  • point position indicators, custom-made signals
  • mechanical point machine TSM series


Reference detailSpain TRAM ProjectsTenerife and other ESP 2005
 2011
 tramOCL

Elektroline was responsible for delivery of TRAM OCL material to the Spain cities, e.g. Barcelona, Granada, Malaga, Murcia, Tenerife (Santa Cruz) de Tenerife), Zaragoza. We supplied especially following products:

  • sleeves and pole fastening
  • supporting and tensioning equipment 
  • section insulators and OCL insulators
  • GRP cantilevers and their components
  • contact wire clamps
  • tensioning mechanism and weights
  • disconnectors
  • suspensions and various OCL holders
Reference detailPardubice TBUS ProjectsPardubice CZE 1991
 2011
 tbusOCL
SIG


Continuous supplies of OCL material for trolley-buses including electrical and mechanical TBUS switches, tbus control systems for electrical switches, tbus crossings and other trolley-bus components. Supervision and assembly of OCL system and installation of feeding station.



Reference detailGhent, Switch pointGhent BEL 2008
 2010
 tramSIG


Delivery and Installation:
  • Switch point control system
  • Point machine (electro-hydraulic)
Nonstop online support by trained Elektroline staff






Reference detailOlomouc Central Station AreaOlomouc CZE 2004
 2010
 tramOCL
SIG

Elektroline was responsible for delivery and installations of both OCL and signaling material such as:

  • tram OCL track assembly 
  • tram loop assembly
  • TSC (TMPKM) control system
  • signaling lamps
  • material for electrical heating of switches
  • GRP cantilevers
  • other OCL material
Reference detailAthens - tbus VETRA systemAthens GRC 2008
 2009
 tbusOCL
SIG

Deliveries and supervising of components and technologies for trolley-bus track, namely:

  • VETRA system - inteligent automatic setting of vehicle's itinerary while passing the city (vehicle's itinerary is automaticly performed until terminus arrival)
  • 50 complete sets of electrical switches
  • 60 complete sets of mechanical switches
  • 60 complete sets of tbus crossings
  • on board equipment of 366 vehicles by VETRA system
  • other OCL and fitting material
Reference detailDaytonDayton USA 2008
 2009
 tbusOCL

Centralized transfer station where trolleybuses can overtake each other at stops, with electrical controlling of switches and signalization of current direction of the switch. Total amount: 

  • 15 complete sets of electrical switches
  • 13 complete sets of mechanical switches
  • 4 pcs of TBUS crossings
  • Material supply plus supervision during assembly