Reference detailSpinozaweg – Molenvliet tram line reconstructionRotterdam NLD2016 tramOCL

Renovation of tramway track.

  • Replacement of current tensioning mechanism by Tensorex tension mechanism
  • Disconnectors replacement
  • Installation of surge arresters
  • Regulation of OCL
  • Poles anchoring
  • Dismantling of old and installation of new OCL
  • section insulators replacement
Reference detailVojvode Stepe ReconstructionBelgrade SRB2015 tramOCL

Delivery of overhead contact line material for the reconstruction of tram catenary track in length of 3.5 km. 

Reference detailDevelopment of the ecological transport in municipality CraiovaCraiova ROU2015 tramOCL

Scope of work performed by Elektroline:

  • full installation of Tramway overhead contact network in total length of 15,6 km single line
  • Installation of overvoltage protection for the OCL 
  • delivery of OCL material
Reference detailRehabilitation of Tramway route 101Ploiesti ROU2015 tramOCL

Increasing of public transport mobility by rehabilitation of tramway route 101 with works targeting the railway, stations with platforms adapted for persons with disabilities, tramways, elements for traffic signalization and automatization – phase II

Scope of work performed by Elektroline:

  • full installation of Tramway overhead contact network in total length of 7,7 km single line.
  • installation of overvoltage protection for the OCL
  • delivery of OCL material


Reference detailTunis Marine Terminal Tunis TUN2015 tramSIG

Delivery yof SIL3 signaling and automatic control system (via TWC) for two electrical switch points at Terminus station (entry and exit to the depot); 14 pcs of resonant truck circuits; remote dispatcher office

Reference detailMelbourne (Control Systems)Melbourne AUS 2014
 2015
 tramSIG

Elektroline has installed tramway switch control systems (tramway signaling system) within Melbourne tramway network including BRC resonant track circuits for fail-safe detection of trams.

Within the time period since June 2014 till June 2015, Elektroline has delivered in total 12 switch control systems (TSC type, SIL3 safety level).

Reference detailInfrastracture Design and Overhead contact Line (Tramline nr. 4)Tallinn EST 2014
 2015
 tramOCL

Elektroline a.s. was responsible for the whole part of tramway catenary system, i. e. for design OCL, delivery of all the material of overhead contact line system, and its assembly.

Reference detailElektričková trať Dúbravka v úseku Hanulova - Pri krížiBratislava SVK2014 tramSIG

Delivery and installation of Electro-hydraulic point machine including control system TSC Tandem. We also installed electrical heating of switches and vehicle departure control from turnabout.

Reference detailTrojsky mostPrague CZE2014 tramOCL

We were responsible for delivery and installation of OCL poles as well as for delivery and assembly of overhead contact line on the bridge and at the surrounding area. We also made special preparation work for the priority of the tram vehicles.

Reference detailIbrahimli Extension and Depot KaratasGaziantep TUR 2013
 2014
 tramSIG

In scope of the project following parts were delivered and put ino operation:

  • electro-hydraulic point machines (24 pcs, with option for another 13 pcs in the future) within the depot
  • electro-hydraulic point machines (12 pcs) on intersections within the city
  • resonant track circuits
  • VETRA communication system (trackside elements) bidirectional communication system between trams and trackside systems
  • necessary hardware + software for automatic setting of tram routes within the depot
  • whole signalisation for tram drivers (traffic lights, point position indicators)
  • computer - client station with visualization of the depot and with possibility to control it
Reference detailLinea 31Milano ITA 2012
 2014
 tramOCL

Delivery of material for TRAM line incl. diode section insulators.

Reference detailMetrocagliari, line 3 Gottardo - PoliclinicoCagliari ITA 2011
 2014
 tramOCL

Delivery of material and assembly of new double track TRAM line which is placed on the 2km-long viaduct. We also made a connection with the substation and partly adjustment at nerby depot.

Reference detailTRAM Warsaw ProjectsWarsaw POL 1999
 2014
 tramOCL
SIG

Elektroline was responsible for delivery of TRAM OCL material and signaling components for the Warszawa city. We supplied especially following products:

  • TMPK and TSC control systems (more than 200 pcs)
  • signaling lamps
  • sleeves and pole fastening
  • supporting and tensioning equipment 
  • section insulators and OCL insulators
  • GRP cantilevers and their components
  • contact wire clamps
  • tensioning mechanism and weights
  • disconnectors
  • suspensions and various OCL holders


Reference detailGeneral OCS & SIGNALING Delivery for PraguePrague CZE 1992
 2014
 tramOCL
SIG

More than 20 years cooperation (assembly & installations, material delivery and regular maintainance of our signaling devices, electro-revisions) with Prague Transport Authority. We have delivered and installed e.g.:

SIGNALING:

  • Automatic control system for switches (more than 220 pcs)
  • Automatic heating system for switchpoints

OCL SYSTEMS:

  • TRAM section insulators
  • TRAM disconnectors
  • GRP cantilevers
  • Components for cantilevers
  • contact wire clamps 
  • tensioning mechanism
Reference detailMetrocagliari, Gottardo-Settimo San PietroCagliari ITA2013 tramOCL

Delivery of OCL material for tram track.