Reference detailMalenovice - OtrokoviceZlin CZE 2010
 2011
 tbusOCL

1st stage: Material supply and assembly of TBUS overhead contact line (cca 750 m), supply of traction cables (2900 m CW). Installation of disconnectors and poles (36 pcs)

2nd stage: Material supply of traction cables (1000 m), TBUS overhead contact line (1280 m), traction tube poles (88 pcs)

Reference detailBlackpool and Fleetwood tramway reconstructionBlackpool GBR 2009
 2011
 tramSIG

Delivery and installation:

  • Switch point control systems TSC (SIL 3)
  • Point machines (electro-hydraulic and mechanical)
  • Radio communication system (VETRA communciation)
  • Preference of trams at junctions (VETRA communication)

Reference detailreconstruction of tramway line 1-4Szeged HUN 2009
 2011
 tramOCL
SIG

Delivery and installation:

  • switch point control systems TSC
  • electro-hydraulic and mechanical point machines (TSH and TSM series)
  • automatic heating of switch points
  • systems for tram priority at traffic lights
  • tram-to-wayside communication system
  • various OCL parts


Reference detailUsti nad LabemUsti nad Labem CZE 2009
 2011
 railOCL

Delivery and installation:

Elektroline a.s. was responsible for delivery and assembly of material for overhead contact line, electrical heating of switches and pole lighting


Reference detailIII. transit corridor Stribro - PlanaStribro, Plana CZE 2008
 2011
 railOCL

ELEKTROLINE a.s. was responsible for delivery and installing of material for   lighting, remote control of disconnectors and remote control of switch heating and lighting

Reference detailSzeged Pulz DepotSzeged HUN 2008
 2011
 tramSIG


Delivery and installation:
  • Switch point control systems
  • Point machines (electro-hydraulic 106 NN and mechanical)
  • Switch point heating
  • Atypical intersection control system
  • Special control system for switch points in depot
  • Overhead Contact Line



Reference detailThe HagueThe Hague NLD 2008
 2011
 tramSIG

Delivery and installation:

  • switch point control systems (SIL 3)
  • point machines (electro-hydraulic)


Reference detailMilanMilan ITA 2007
 2011
 tbusOCL

Material supply, site management in assembly of electrical TBUS switches. 

  • delivery of 40 complete sets of electrical switches with radio remote control
Reference detailGoteborg tramway signalingGöteborg SWE 2005
 2011
 tramSIG

Delivery:

  • track circuits BRC (new generation safety assessed track circuits)
  • point position indicators, custom-made signals
  • mechanical point machine TSM series


Reference detailSpain TRAM ProjectsTenerife and other ESP 2005
 2011
 tramOCL

Elektroline was responsible for delivery of TRAM OCL material to the Spain cities, e.g. Barcelona, Granada, Malaga, Murcia, Tenerife (Santa Cruz) de Tenerife), Zaragoza. We supplied especially following products:

  • sleeves and pole fastening
  • supporting and tensioning equipment 
  • section insulators and OCL insulators
  • GRP cantilevers and their components
  • contact wire clamps
  • tensioning mechanism and weights
  • disconnectors
  • suspensions and various OCL holders
Reference detailPardubice TBUS ProjectsPardubice CZE 1991
 2011
 tbusOCL
SIG


Continuous supplies of OCL material for trolley-buses including electrical and mechanical TBUS switches, tbus control systems for electrical switches, tbus crossings and other trolley-bus components. Supervision and assembly of OCL system and installation of feeding station.



Reference detailPiazza BottiniMilan ITA2010 tbusOCL

Delivery and assembly of TBUSxTRAM crossings and OCL and OCL material and of TBUS electrical (2 sets) and mechanical switches (2 sets) - Piazza Bottini

Reference detailPlzenska - smycka RepyPrague CZE2010 tramOCL
SIG

Reconstruction of tram line section between Plzenska street and tram loop in Repy city part. Installation of automatic control systems including heating of switches and signalling. Delivery and assembly especially of:

  • signaling control systems (automatic control system TSC 6 pcs, signaling lamps, heating of switches - TVAM system - 4 pcs)
  • poles
  • contact wire clamps
  • cantilevers
  • tensioning mechanism
  • sleeves and pole fastening material


Reference detailŁódźŁódź POL2010 tramSIG

Delivery and installation of signaling systems including signaling components, especially:

  • point machine TSH 106 LC (SIL3)
  • control system TSC (SIL3)


Reference detailBorská polePlzen CZE 2009
 2010
 tbusOCL
  • delivery and assembly of complete electrical TBUS switches (6 sets) including automatic control system - VETRA
  • delivery and assembly of complete mechanical TBUS switches (5 sets)
  • delivery and installation of 3 sets of TBUS x TBUS crossings
  • other OCL material