Reference detailLetna - Prasny mostPrague CZE 2009
 2010
 tramOCL
SIG

Material supply and assembly of OCL and signalling systems in tramway section Letna - Spejchar junction - Prasny most in Prague. Total length of tramway track is 2 840 m. We supplied and installed especially:

  • poles
  • cantilevers
  • disconnectors
  • supporting and tensioning equipment
  • 9 complete sets of automatic control system TSC including switch controlling and heating
  • section insulators
  • components for cantilevers, insulators, contact wire clamps, etc.


Reference detailGhent, Switch pointGhent BEL 2008
 2010
 tramSIG


Delivery and Installation:
  • Switch point control system
  • Point machine (electro-hydraulic)
Nonstop online support by trained Elektroline staff






Reference detailOlomouc Central Station AreaOlomouc CZE 2004
 2010
 tramOCL
SIG

Elektroline was responsible for delivery and installations of both OCL and signaling material such as:

  • tram OCL track assembly 
  • tram loop assembly
  • TSC (TMPKM) control system
  • signaling lamps
  • material for electrical heating of switches
  • GRP cantilevers
  • other OCL material
Reference detailLiberec - JablonecLiberec CZE2009 tramOCL

Material supply and installation of traction cables in section of tramway line Liberec - Jablonec in total length of cables (1350 m).

Reference detailNaplesNaples ITA2009 tbusOCL
  • Delivery, assembly and supervision of electrical and mechanical switches for trolleybus tracks
  • Assembly and delivery of the TBUSxTRAM crossing where the vehicles can passage through with current in both ways (both trolleybus as well as train)
  • Delivery of TBUS section insulators, including type where the vehicles can passage through with current




Reference detailTrojskaPrague CZE2009 tramOCL

Material supply and assembly of final section of tramway track and delivery and installation of temporary section of tramway track from Trojska street to Trojsky most.

  • 1065 metres of tram track in total 
  • poles
  • motor drives
  • disconnectors
  • section insulator
Reference detailSalzburgSalzburg AUT2009 tbusOCL

Delivery and installation:

  • Delivery of electrical and mechanical switches for trolley-bus track
  • Delivery of TBUS x TRAIN crossing where the vehicles can passage through with current in both ways (both trolley-bus as well as train)


Reference detailAthens - tbus VETRA systemAthens GRC 2008
 2009
 tbusOCL
SIG

Deliveries and supervising of components and technologies for trolley-bus track, namely:

  • VETRA system - inteligent automatic setting of vehicle's itinerary while passing the city (vehicle's itinerary is automaticly performed until terminus arrival)
  • 50 complete sets of electrical switches
  • 60 complete sets of mechanical switches
  • 60 complete sets of tbus crossings
  • on board equipment of 366 vehicles by VETRA system
  • other OCL and fitting material
Reference detailDaytonDayton USA 2008
 2009
 tbusOCL

Centralized transfer station where trolleybuses can overtake each other at stops, with electrical controlling of switches and signalization of current direction of the switch. Total amount: 

  • 15 complete sets of electrical switches
  • 13 complete sets of mechanical switches
  • 4 pcs of TBUS crossings
  • Material supply plus supervision during assembly
Reference detailFlorenceFlorence ITA 2008
 2009
 tramOCL

Material supply for tramway track and depot, especially:

  • special cantilevers according to customer requirements
  • section insulators
  • supporting and tensioning equipment, components for cantilevers, insulators, contact wire clamps, etc.
Reference detailtram and trolley-buses tracksMoscow RUS 2008
 2009
 tbusOCL

Elektroline was responsible for delivery of OCL material for tbus and tram tracks:

  • mechanical TBUS switches
  • flexible anchorage sets
  • GRP cantilevers
  • section insulators
  • contact wire clamps
Reference detailReconstruction of Americka streetPlzen CZE 2008
 2009
 tbusOCL

Elektroline Inc. was responsible for delivery and assembly of OCL material including electrical (5 sets) and mechanical (5 sets) switches and their control by VETRA technology, signaling and instalation of the non-insulated crossing TRAM x TBUS.

Reference detailModernization of Sokolov Railway StationSokolov CZE 2008
 2009
 railSIG

In this project Elektroline was responsible for delivery and installing of:

  • material for station illumination
  • partial illumination of nearby bus station
  • remote control of illumination
  • electrical heating of switches including remote control
  • remote control of disconnectors
Reference detailkrizovatka MasarykovaTeplice CZE 2008
 2009
 tbusOCL

Reconstruction of OCL and installation of traction cables at roundabout in Teplice. Our company carried out assembly and material supply especially:

  • electrical switches for trolley-buses (tense system)
  • mechanical switches for trolley-buses (tense system)
  • cantilevers
  • disconnectors
  • supporting and tensioning equipment
Reference detailTRAM line Soseaua Mihai BravuBucharest ROU2008 tramOCL

Elektroline Inc. was responsible for instalation and delivery of material for overhead contact line in total length of 7 km doubletrack. 

  • contact line
  • GRP cantilevers
  • components for cantilevers
  • section insulators
  • TM x TB crossings
  • other necessary equipment