Reference detailPoznanPoznan POL 2010
 2017
 tramSIG

Delivery and installation of signaling systems including signaling components, especially:

  • point machine TSH 106 LC (SIL3) - 86 pcs
  • point machine mechanical - 71 pcs
  • control system TSC (SIL3)
  • signal lamp
Reference detailPlzen - signaling projectsPlzen CZE 2009
 2017
 tramSIG

Delivery and installation:

  • Switch point control systems TSC (SIL 3)
  • Point machines (electro-hydraulic) - 60 pcs 
  • Point machines (mechanical) - 2 pcs
  • Radio communication system (VETRA communciation)
  • Automatic switch point heating
  • Point position indicators
  • Periodic maintenance by trained Elektroline personnel
Reference detailBrusselsBrussels BEL 2007
 2017
 tramSIG

Delivery and installation:


  • Point machines (more than 150 pcs of electro-hydraulic and over 200 of mechanical); 
  • Nonstop online support by trained Elektroline personnel



Reference detailBydgoszczBydgoszcz POL 2007
 2017
 tramSIG

Delivery and installation of signaling systems including signaling components, especially:

  • point machine TSH 106 LC (SIL3) - 40 pcs
  • mechanical point machine - over 40 pcs
Reference detailSpinozaweg – Molenvliet tram line reconstructionRotterdam NLD2016 tramOCL

Renovation of tramway track.

  • Replacement of current tensioning mechanism by Tensorex tension mechanism
  • Disconnectors replacement
  • Installation of surge arresters
  • Regulation of OCL
  • Poles anchoring
  • Dismantling of old and installation of new OCL
  • section insulators replacement
Reference detailReconstruction of the station Horažďovice předměstíHorazdovice predmesti CZE 2015
 2016
 railOCL
SIG

Elektroline a.s. was responsible for complete delivery and assembly overhead contact line system 25 kV AC (ARCAS-EL); remote control of sectional disconnectors; low and medium voltage technologies, railway station lighting; delivery and assembly substations 27/2x0,2 kV for station interlocking systems, 25/0,4 kV for electric heating systems and 25/3kV for electrical pre-heating equipment for railway vehicles and wagons, delivery and assembly of electric switch heating system (ESHS) and remote control and monitoring of railway station lighting and ESHS at the station Horažďovice předměstí.

Reference detailRevitalization of the railway Trutnov – Teplice nad Metují Adrspach CZE2015 railSIG

Elektroline a.s. was responsible for complete delivery and assembly of automatic Electrical Heating of Switches System (EHS) at the station Adršpach and remote control and monitoring from station Teplice nad Metují.

Reference detailVojvode Stepe ReconstructionBelgrade SRB2015 tramOCL

Delivery of overhead contact line material for the reconstruction of tram catenary track in length of 3.5 km. 

Reference detailDevelopment of the ecological transport in municipality CraiovaCraiova ROU2015 tramOCL

Scope of work performed by Elektroline:

  • full installation of Tramway overhead contact network in total length of 15,6 km single line
  • Installation of overvoltage protection for the OCL 
  • delivery of OCL material
Reference detailReconstruction of the railway Klatovy – Železná Ruda Klatovy – Zelezna Ruda  CZE2015 railSIG

Elektroline a.s. was responsible for complete delivery and assembly of automatic Electrical Heating of Switches System (EHS) in 6 railway stations (Janovice nad Úhlavou, Nýrsko, Zelená Lhota, Hamry - Hojsova Stráž, Špičák, Železná Ruda – Alžbětín), and remote control and monitoring from station Železná Ruda - Alžbětín

Reference detailRehabilitation of Tramway route 101Ploiesti ROU2015 tramOCL

Increasing of public transport mobility by rehabilitation of tramway route 101 with works targeting the railway, stations with platforms adapted for persons with disabilities, tramways, elements for traffic signalization and automatization – phase II

Scope of work performed by Elektroline:

  • full installation of Tramway overhead contact network in total length of 7,7 km single line.
  • installation of overvoltage protection for the OCL
  • delivery of OCL material


Reference detailStara Zagora TBUS Switches VETRA LightStara Zagora BGR2015 tbusOCL
SIG

Delivery of trolleybus switches with VETRA Light Technology including vehicle equipment (assembly and supervision).

Reference detailTunis Marine Terminal Tunis TUN2015 tramSIG

Delivery yof SIL3 signaling and automatic control system (via TWC) for two electrical switch points at Terminus station (entry and exit to the depot); 14 pcs of resonant truck circuits; remote dispatcher office

Reference detailMelbourne (Control Systems)Melbourne AUS 2014
 2015
 tramSIG

Elektroline has installed tramway switch control systems (tramway signaling system) within Melbourne tramway network including BRC resonant track circuits for fail-safe detection of trams.

Within the time period since June 2014 till June 2015, Elektroline has delivered in total 12 switch control systems (TSC type, SIL3 safety level).

Reference detailInfrastracture Design and Overhead contact Line (Tramline nr. 4)Tallinn EST 2014
 2015
 tramOCL

Elektroline a.s. was responsible for the whole part of tramway catenary system, i. e. for design OCL, delivery of all the material of overhead contact line system, and its assembly.

Reference detailÚsti nad OrlicíÚsti nad Orlicí CZE 2013
 2015
 railOCL

Elektroline Inc. was responsible for delivery and assembly of overhead contact line system, remote control of sectional disconnectors, high-voltage substation, lithing in pedestrian underpass, heavy current wiring, electrical heating of switches and more.

Reference detailElektričková trať Dúbravka v úseku Hanulova - Pri krížiBratislava SVK2014 tramSIG

Delivery and installation of Electro-hydraulic point machine including control system TSC Tandem. We also installed electrical heating of switches and vehicle departure control from turnabout.

Reference detailBaross square projectBudapest HUN2014 tbusOCL

Delivery of TBUS OCL material for trolleybus track e.g. cantilevers, section insulators, curve clamps, crossings, etc. We also supervised the assembly of tbus line. 

Reference detailViale AmendolaLa Spezia ITA2014 tbusOCL

Dismantle of current cantilevers and delivery and installation of new cantilevers incl. suspended OCL material for trolleybus track.

Reference detailTrojsky mostPrague CZE2014 tramOCL

We were responsible for delivery and installation of OCL poles as well as for delivery and assembly of overhead contact line on the bridge and at the surrounding area. We also made special preparation work for the priority of the tram vehicles.

Reference detailIbrahimli Extension and Depot KaratasGaziantep TUR 2013
 2014
 tramSIG

In scope of the project following parts were delivered and put ino operation:

  • electro-hydraulic point machines (24 pcs, with option for another 13 pcs in the future) within the depot
  • electro-hydraulic point machines (12 pcs) on intersections within the city
  • resonant track circuits
  • VETRA communication system (trackside elements) bidirectional communication system between trams and trackside systems
  • necessary hardware + software for automatic setting of tram routes within the depot
  • whole signalisation for tram drivers (traffic lights, point position indicators)
  • computer - client station with visualization of the depot and with possibility to control it
Reference detailNew TBUS DepotPilsen CZE 2013
 2014
 tbusOCL
SIG

We carried out delivery and installation of overhead contact systems for new trolleybus depot, as well as delivery and installation of automatic system for switches operation (VETRA) including all related software and computer for dispatching room. The project include e.g.:


  • 26 sets of electric switches
  • 26 sets of mechanical switches
  • 102 pcs of section insulators
  • 44 pcs of disconnectors

"Our company was pleased and fully satisfied with quality level of executed works as well as with the professional team involved in this project. Taking into consideration the above mentioned we would like to recommend Elektroline a.s. as an excellent option for executing of the OCL systems work".

Reference detailLyon TBUS line C13Lyon FRA 2012
 2014
 tbusOCL

We partly delivered material for the track and completely assembly of tbus track C13 in Lyon.


Due to very high trafic and important lines and rotes in direction of Lyon airport in this part of Lyon whole track was totally assembled at night hours.

Reference detailLinea 31Milano ITA 2012
 2014
 tramOCL

Delivery of material for TRAM line incl. diode section insulators.

Reference detailMetrocagliari, line 3 Gottardo - PoliclinicoCagliari ITA 2011
 2014
 tramOCL

Delivery of material and assembly of new double track TRAM line which is placed on the 2km-long viaduct. We also made a connection with the substation and partly adjustment at nerby depot.

Reference detailTRAM Warsaw ProjectsWarsaw POL 1999
 2014
 tramOCL
SIG

Elektroline was responsible for delivery of TRAM OCL material and signaling components for the Warszawa city. We supplied especially following products:

  • TMPK and TSC control systems (more than 200 pcs)
  • signaling lamps
  • sleeves and pole fastening
  • supporting and tensioning equipment 
  • section insulators and OCL insulators
  • GRP cantilevers and their components
  • contact wire clamps
  • tensioning mechanism and weights
  • disconnectors
  • suspensions and various OCL holders


Reference detailGeneral OCS & SIGNALING Delivery for PraguePrague CZE 1992
 2014
 tramOCL
SIG

More than 20 years cooperation (assembly & installations, material delivery and regular maintainance of our signaling devices, electro-revisions) with Prague Transport Authority. We have delivered and installed e.g.:

SIGNALING:

  • Automatic control system for switches (more than 220 pcs)
  • Automatic heating system for switchpoints

OCL SYSTEMS:

  • TRAM section insulators
  • TRAM disconnectors
  • GRP cantilevers
  • Components for cantilevers
  • contact wire clamps 
  • tensioning mechanism
Reference detailMetrocagliari, Gottardo-Settimo San PietroCagliari ITA2013 tramOCL

Delivery of OCL material for tram track.

Reference detailTramvajová trať Nové Sady - část BOlomouc CZE2013 tramOCL

Delivery of material and assembly of new tram line. We also delivered equipment for heating of switches.

Reference detailTest TrackPilsen CZE2013 railOCL

Elektroline Inc. was responsible for designing, delivery and assembly of overhead contact line system (ARCAS-EL) incl. technology for detection and signalization of traction voltage level in contact line system in range of DC 0,6 – 4 kV, AC 15 kV 16 2/3 Hz, AC 25 kV 50 Hz.  


Reference detailRenovation of MarconipleinRotterdam NLD2013 tramOCL

Delivery of OCL material for tramway track.

Reference detailGold Coast Light RailGold Coast AUS 2012
 2013
 tramOCL

Delivery of the complete system of over head contact line material for 13km light trail track.

Reference detailAssembly of tbus switchesLa Spezia ITA 2012
 2013
 tbusOCL

Assembly and material delivery of electrical tbus switches including control systems. We also delivered other OCL material for tbus track.

Reference detailTrolejbus Karolina 1. etapa TVOstrava CZE 2012
 2013
 tbusOCL

Installation and delivery of OCL material (including electrical switches and control systems, tbus crossings, disconnectors, etc.) for TBUS line.

Reference detailFranowo DepotPoznan POL 2012
 2013
 tramSIG

In this project we are/were responsible for these deliveries and installations:

  • Automatic control system of depot
  • software & visualization for movement of vehicles within the depot
  • 42 pcs of electro-hydraulic point machines
  • 39 pcs of mechanical point machines
  • 95 pcs of resonant track circuits
  • other material and equipment: tram detection elements, signaling lamps, etc.
Reference detailRevitalisatie Nieuwe BinnenwegRotterdam NLD 2012
 2013
 tramOCL

Delivery of OCL material for tramway track and public lightning

Reference detailMalenovice - Otrokovice C440 TVMalenovice - Otrokovice CZE 2011
 2013
 tbusOCL

Installation and delivery of OCL material for TBUS line.

Reference detailPassage through rail. junction Plzen in direction of the 3rd Transit Rail. corridorPilsen CZE 2011
 2013
 railOCL

Elektroline Inc. was responsible for delivery and assembly of railway overhead contact line system (ARCAS-EL).

Reference detailVidin Bridge II, Vidin Calafat, Part: Catenary, Part: ElektricityVidin BGR 2011
 2013
 railOCL
SIG

Elektroline Inc. was responsible for delivery and assembly of railway overhead contact line system (ARCAS) incl. remote control of sectional disconnectors.


Elektroline Inc. was responsible for delivery and assembly of electricity on the Bridge – LV and MV technology  incl. cabling, bridge highway and architecture lighting, power station 20/0,4 kV and bridge lightning protection.


Reference detailAssembly of tbus line - Burgers' ZOO projectsArnhem NLD2012 tbusOCL

Assembly of single track tbus line in lenght of 1.5km including end loop at Burgers' ZOO entry area. We also designed and delivered one complete set of tbus crossing 85° with insulation in both passing directions. Assembly of two complete sets of disconnectors including automatic power supply disconnecting control and further we also delivered the signalling of no voltage status.

Reference detailOCL repair of lightrail track in BergenBergen NOR2012 tramOCL

Delivery of OCL material and adjustment of 10 kms lightrailtrack. Especially reparation and contact wire stagger adjustment of lightrail track (10kms) in tunnel.

Reference detailGhent Langevelden level crossing signaling systemGhent BEL2012 tramSIG

Description of responsibilities:

  • SIL3 signaling system for tramway level crossing
  • SIL3/SIL2 resonant track circuits
Reference detailGothenburg tram lineGothenburg SWE2012 tramOCL

Delivery of OCL material for tram line.

Reference detailReconstruction of tram lineKharkov UKR2012 tramOCL

Supervision and delivery of material for reconstruction of tram line just beside stadium of EURO 2012 Chamionship. We delivered mainly:

  • disconnectors
  • cantilevers up to 9m 
  • section insulators
  • tensioning mechanism
  • exchange field
  • contact wire clamps, etc
Reference detailRondo im. Janusza KrupskiegoLublin POL2012 tbusOCL

Delivery of overhead contact line material for tbus track including electrical switches, mechanical switches, cantilevers and diode insulators. Installation of VETRA system into the vehicles.

Reference detailTBUS trať: U trati - Borská v Plzni II, etapa Doudlevecká - SirkovaPlzen CZE2012 tbusOCL

Construction of tbus alternate roadincluding two crossroads. We was responsible for delivery and installation of tbus crossing or tbus switches controlled by VETRA system.

Reference detailInstalation of TBUS switchesLyon FRA 2011
 2012
 tbusOCL

Inspection and installation improvement of trolleybus switches, trolleybus crossings and other OCL equipment including improvement of tbus roundabout on the line C1/C2.

Reference detailNew Palermo TRAM linePalermo ITA 2011
 2012
 tramOCL

Delivery of the OCL material for new tram line and for two tram depots (Rocella depot, Leonardo depot).

Reference detailDanube Bridge and Adjoining Infrastructure ProjectVidin BGR 2009
 2012
 railOCL

Delivery and installation of electrical and OCL equipment including ARCAS system (15 km). Our main responsibility in the project is to build complete over-head contact line for rail traffic, illumination of railway stations & nearby road overpasses and traction substation 27,5 kV.


Danube Bridge and Adjoining Infrastructure Project is very significant rail-route construction in region of Eastern Europe. This bridge will become new transit connection between Bulgaria (Vidin) and Romania (Calafat). Until now it was not possible to cross the Danube River another way than by the ferry or hundreds kilometers far away bridges. It will be changed within several months. The importance of the bridge also consists in that matter it connects rail as well as road traffic. Our main responsibility in the project is to build complete over-head contact line for rail traffic, illumination of railway stations and traction substation 27,5 kV. We are very glad we can be part of such a project.  


Reference detailRegulation of OCLBergen NOR2011 tramOCL

Delivery of OCL material for regulation of OCL high. Regulation of overhead contact line (catenary system) in horizontal and also in vertical direction. Assembly in total length of 1800m double track including 700m in tunnel.

Reference detailMonserrato Depot in CagliariCagliari ITA2011 tramOCL

Supply and assembly of OCL material for electrical traction, for extension of existing power supply line to other tracks where the trams pass, in the area of depot and maintenance workshop, situated inside the location of Operation Head Office of Metro Cagliari in Monserrato.

Reference detailWestvest temporary terminusDelft NLD2011 tramSIG

Delivery and installation:

  • Delivery and installation of driver´s keyboard control system for electro-hydraulic point machine
  • Including electro-hydraulical point machine installed in ground box
Reference detailGdansk TRAM lineGdansk POL2011 tramOCL
SIG

Delivery of material for reconstruction of current line and construction of new tram line including electrical and mechanical point machines and their control systems. Supervision and installation of point machines. Delivery of OCL and signaling components:

  • Electro-hydraulic point machines (18 pcs)
  • Mechanical point machines (15 pcs)
  • Switch point control systems TSC (SIL 3)
  • GRP cantilevers
  • Section insulators
  • Disconnectors including motor drives
  • Flexible anchorage sets
  • Insulators
  • Components for cantilevers and other OCL material



Reference detailReconstruction of Hnevice Railway StationHnevice CZE2011 railSIG

In this project Elektroline was responsible for delivery and installing of:

  • electric heating of switches reconstruction (23 pcs) of Horice station
  • remote control of electric heating of switches
  • construction of new distribution substation 22/0.4 kV plus its medium-voltage cable connection 22kV
Reference detailMelbourne, track circuitsMelbourne AUS2011 tramSIG

Delivery and installation:

  • Delivery of fail-safe track circuits BRC for detecting presence of a tram within tram stops
  • Including GSM communication module for remote diagnostics of the system
Reference detailTram Depot BaggioMilan ITA2011 tramSIG

Delivery and installation:

  • Automatic control system of entrance to the depot 
  • Point machine (electro-hydraulic)
  • Resonant track circuits BRC (SIL 2 safety assessed)

Reference detailRNV- Linie 5 an der BergstraßeWeinheim DEU2011 tramOCL

Delivery of material for tram catenary track:

  • GRP cantilevers
  • components for cantilevers and other OCL material
  • insulators
Reference detailTRAM Depot LekstraatAmsterdam NLD 2010
 2011
 tramSIG

Project description:

  • semi-automatic depot control system
  • automatic washing management system
  • custom-made real-time visualization
  • including fail-safe track circuits BRC


Reference detailGaziantep DepotGaziantep TUR 2010
 2011
 tramSIG

Delivery and installation of signaling systems and components:

  • semi-automatic depot control system
  • VETRA tram-to-way side communication system
  • tram priority system
  • point machines (electro-hydraulic and mechanical)
Reference detailNew tram trackNorrköping SWE 2010
 2011
 tramOCL

Delivery of tram OCL components:

  • disconnectors including mechanical drives and their components
  • GRP cantilevers plus components for cantilevers
  • OCL clamps and holders
  • weights for movable anchorage
  • insulators
Reference detailMalenovice - OtrokoviceZlin CZE 2010
 2011
 tbusOCL

1st stage: Material supply and assembly of TBUS overhead contact line (cca 750 m), supply of traction cables (2900 m CW). Installation of disconnectors and poles (36 pcs)

2nd stage: Material supply of traction cables (1000 m), TBUS overhead contact line (1280 m), traction tube poles (88 pcs)

Reference detailBlackpool and Fleetwood tramway reconstructionBlackpool GBR 2009
 2011
 tramSIG

Delivery and installation:

  • Switch point control systems TSC (SIL 3)
  • Point machines (electro-hydraulic and mechanical)
  • Radio communication system (VETRA communciation)
  • Preference of trams at junctions (VETRA communication)

Reference detailreconstruction of tramway line 1-4Szeged HUN 2009
 2011
 tramOCL
SIG

Delivery and installation:

  • switch point control systems TSC
  • electro-hydraulic and mechanical point machines (TSH and TSM series)
  • automatic heating of switch points
  • systems for tram priority at traffic lights
  • tram-to-wayside communication system
  • various OCL parts


Reference detailUsti nad LabemUsti nad Labem CZE 2009
 2011
 railOCL

Delivery and installation:

Elektroline a.s. was responsible for delivery and assembly of material for overhead contact line, electrical heating of switches and pole lighting


Reference detailIII. transit corridor Stribro - PlanaStribro, Plana CZE 2008
 2011
 railOCL

ELEKTROLINE a.s. was responsible for delivery and installing of material for   lighting, remote control of disconnectors and remote control of switch heating and lighting

Reference detailSzeged Pulz DepotSzeged HUN 2008
 2011
 tramSIG


Delivery and installation:
  • Switch point control systems
  • Point machines (electro-hydraulic 106 NN and mechanical)
  • Switch point heating
  • Atypical intersection control system
  • Special control system for switch points in depot
  • Overhead Contact Line



Reference detailThe HagueThe Hague NLD 2008
 2011
 tramSIG

Delivery and installation:

  • switch point control systems (SIL 3)
  • point machines (electro-hydraulic)


Reference detailMilanMilan ITA 2007
 2011
 tbusOCL

Material supply, site management in assembly of electrical TBUS switches. 

  • delivery of 40 complete sets of electrical switches with radio remote control
Reference detailGoteborg tramway signalingGöteborg SWE 2005
 2011
 tramSIG

Delivery:

  • track circuits BRC (new generation safety assessed track circuits)
  • point position indicators, custom-made signals
  • mechanical point machine TSM series


Reference detailSpain TRAM ProjectsTenerife and other ESP 2005
 2011
 tramOCL

Elektroline was responsible for delivery of TRAM OCL material to the Spain cities, e.g. Barcelona, Granada, Malaga, Murcia, Tenerife (Santa Cruz) de Tenerife), Zaragoza. We supplied especially following products:

  • sleeves and pole fastening
  • supporting and tensioning equipment 
  • section insulators and OCL insulators
  • GRP cantilevers and their components
  • contact wire clamps
  • tensioning mechanism and weights
  • disconnectors
  • suspensions and various OCL holders
Reference detailPardubice TBUS ProjectsPardubice CZE 1991
 2011
 tbusOCL
SIG


Continuous supplies of OCL material for trolley-buses including electrical and mechanical TBUS switches, tbus control systems for electrical switches, tbus crossings and other trolley-bus components. Supervision and assembly of OCL system and installation of feeding station.



Reference detailPiazza BottiniMilan ITA2010 tbusOCL

Delivery and assembly of TBUSxTRAM crossings and OCL and OCL material and of TBUS electrical (2 sets) and mechanical switches (2 sets) - Piazza Bottini

Reference detailPlzenska - smycka RepyPrague CZE2010 tramOCL
SIG

Reconstruction of tram line section between Plzenska street and tram loop in Repy city part. Installation of automatic control systems including heating of switches and signalling. Delivery and assembly especially of:

  • signaling control systems (automatic control system TSC 6 pcs, signaling lamps, heating of switches - TVAM system - 4 pcs)
  • poles
  • contact wire clamps
  • cantilevers
  • tensioning mechanism
  • sleeves and pole fastening material


Reference detailŁódźŁódź POL2010 tramSIG

Delivery and installation of signaling systems including signaling components, especially:

  • point machine TSH 106 LC (SIL3)
  • control system TSC (SIL3)


Reference detailBorská polePlzen CZE 2009
 2010
 tbusOCL
  • delivery and assembly of complete electrical TBUS switches (6 sets) including automatic control system - VETRA
  • delivery and assembly of complete mechanical TBUS switches (5 sets)
  • delivery and installation of 3 sets of TBUS x TBUS crossings
  • other OCL material
Reference detailLetna - Prasny mostPrague CZE 2009
 2010
 tramOCL
SIG

Material supply and assembly of OCL and signalling systems in tramway section Letna - Spejchar junction - Prasny most in Prague. Total length of tramway track is 2 840 m. We supplied and installed especially:

  • poles
  • cantilevers
  • disconnectors
  • supporting and tensioning equipment
  • 9 complete sets of automatic control system TSC including switch controlling and heating
  • section insulators
  • components for cantilevers, insulators, contact wire clamps, etc.


Reference detailGhent, Switch pointGhent BEL 2008
 2010
 tramSIG


Delivery and Installation:
  • Switch point control system
  • Point machine (electro-hydraulic)
Nonstop online support by trained Elektroline staff






Reference detailOlomouc Central Station AreaOlomouc CZE 2004
 2010
 tramOCL
SIG

Elektroline was responsible for delivery and installations of both OCL and signaling material such as:

  • tram OCL track assembly 
  • tram loop assembly
  • TSC (TMPKM) control system
  • signaling lamps
  • material for electrical heating of switches
  • GRP cantilevers
  • other OCL material
Reference detailLiberec - JablonecLiberec CZE2009 tramOCL

Material supply and installation of traction cables in section of tramway line Liberec - Jablonec in total length of cables (1350 m).

Reference detailNaplesNaples ITA2009 tbusOCL
  • Delivery, assembly and supervision of electrical and mechanical switches for trolleybus tracks
  • Assembly and delivery of the TBUSxTRAM crossing where the vehicles can passage through with current in both ways (both trolleybus as well as train)
  • Delivery of TBUS section insulators, including type where the vehicles can passage through with current




Reference detailTrojskaPrague CZE2009 tramOCL

Material supply and assembly of final section of tramway track and delivery and installation of temporary section of tramway track from Trojska street to Trojsky most.

  • 1065 metres of tram track in total 
  • poles
  • motor drives
  • disconnectors
  • section insulator
Reference detailSalzburgSalzburg AUT2009 tbusOCL

Delivery and installation:

  • Delivery of electrical and mechanical switches for trolley-bus track
  • Delivery of TBUS x TRAIN crossing where the vehicles can passage through with current in both ways (both trolley-bus as well as train)


Reference detailAthens - tbus VETRA systemAthens GRC 2008
 2009
 tbusOCL
SIG

Deliveries and supervising of components and technologies for trolley-bus track, namely:

  • VETRA system - inteligent automatic setting of vehicle's itinerary while passing the city (vehicle's itinerary is automaticly performed until terminus arrival)
  • 50 complete sets of electrical switches
  • 60 complete sets of mechanical switches
  • 60 complete sets of tbus crossings
  • on board equipment of 366 vehicles by VETRA system
  • other OCL and fitting material
Reference detailDaytonDayton USA 2008
 2009
 tbusOCL

Centralized transfer station where trolleybuses can overtake each other at stops, with electrical controlling of switches and signalization of current direction of the switch. Total amount: 

  • 15 complete sets of electrical switches
  • 13 complete sets of mechanical switches
  • 4 pcs of TBUS crossings
  • Material supply plus supervision during assembly
Reference detailFlorenceFlorence ITA 2008
 2009
 tramOCL

Material supply for tramway track and depot, especially:

  • special cantilevers according to customer requirements
  • section insulators
  • supporting and tensioning equipment, components for cantilevers, insulators, contact wire clamps, etc.
Reference detailtram and trolley-buses tracksMoscow RUS 2008
 2009
 tbusOCL

Elektroline was responsible for delivery of OCL material for tbus and tram tracks:

  • mechanical TBUS switches
  • flexible anchorage sets
  • GRP cantilevers
  • section insulators
  • contact wire clamps
Reference detailReconstruction of Americka streetPlzen CZE 2008
 2009
 tbusOCL

Elektroline Inc. was responsible for delivery and assembly of OCL material including electrical (5 sets) and mechanical (5 sets) switches and their control by VETRA technology, signaling and instalation of the non-insulated crossing TRAM x TBUS.

Reference detailModernization of Sokolov Railway StationSokolov CZE 2008
 2009
 railSIG

In this project Elektroline was responsible for delivery and installing of:

  • material for station illumination
  • partial illumination of nearby bus station
  • remote control of illumination
  • electrical heating of switches including remote control
  • remote control of disconnectors
Reference detailkrizovatka MasarykovaTeplice CZE 2008
 2009
 tbusOCL

Reconstruction of OCL and installation of traction cables at roundabout in Teplice. Our company carried out assembly and material supply especially:

  • electrical switches for trolley-buses (tense system)
  • mechanical switches for trolley-buses (tense system)
  • cantilevers
  • disconnectors
  • supporting and tensioning equipment
Reference detailTRAM line Soseaua Mihai BravuBucharest ROU2008 tramOCL

Elektroline Inc. was responsible for instalation and delivery of material for overhead contact line in total length of 7 km doubletrack. 

  • contact line
  • GRP cantilevers
  • components for cantilevers
  • section insulators
  • TM x TB crossings
  • other necessary equipment
Reference detailRadlicka ul.Prague CZE2008 tramOCL
SIG

Entire part of double track tramway line (length = 1km) including terminal loop. Supply and installation of disconnectors including motor drives and their remote control, controlling and heating of tramway switches.

Reference detailsignaling system for Anna Kút intersectionSzeged HUN2008 tramOCL
SIG

Delivery and installation:

  • automatic signaling system for the intersection area
  • automatic heating of switch points
  • systems for tram priority at traffic lights
  • tram-to-wayside communication system
  • overhead contact line system



Reference detailTerminal Hradec KraloveHradec Kralove CZE 2007
 2008
 tbusOCL

Assembly and supervision of OCL and assembly of OCL in terminal as well. Installation of 17 sets electrical switches (suspended below system) incl. VETRA controlling and 18 sets of mechanical switches (suspended below system). Further assembly of 6 pcs of TBUS crossing.

Reference detailPrague main railway stationPrague CZE 2007
 2008
 railOCL
SIG

Elektroline a.s. was responsible for delivery and installing of material for electrical switch heating (including automatic control), railway station lighting (Prague).

Reference detailTramway line ŁódźŁódź POL 2007
 2008
 tramOCL

We delivered OCL material for tram line project (16 kms doubletrack), especially following material:

  • 55 mm GRP cantilevers and related 55mm armatures
  • disconnectors
  • devices for thermal compensation of contact wire (tension mechanism)
  • clamps and clips


Reference detailIstanbulIstanbul TUR 2006
 2008
 tramOCL


Material supply for LIGHT RAIL LINE.



Reference detailVologdaVologda RUS 2006
 2008
 tbusOCL

Material supply for trolley-bus track, especially:

  • electrical tbus switches 17 compl.
  • mechanical tbus switches 17 compl.
  • trolley-bus crossing 15 sets
Reference detailSofia control systemsSofia BGR 2005
 2008
 tramSIG

Elektroline Inc. has executed the delivery and installing of automatic control systems TMPKM for tram switches in the city of Sofia.


Reference detailVoula tram lineAthens GRC2007 tramOCL
SIG

Extension of current tram line. Delivery and installation of signaling systems and components. Supply and assembly of over-head contact line (OCL). Nonstop online support by trained Elektroline personnel.

Delivery and installation especially:

  • switch point control systems
  • point machines (electro-hydraulic and mechanical)
  • signaling lamps
  • cantilevers
  • tensioning mechanism
  • contact wire clamps

Reference: 

„(...) the final result fully met the technical specifications of the project as well as they met our expectations. (...) we would like to recommend Elektroline a.s. as an excellent option for executing this type of works. (...)“

Reference detailGdynia DepotGdynia POL2007 tbusOCL

Material supply for tbus depot:

  • disconnectors including motor drives
  • remote control of disconnectors
  • novoltage status signalisation including security of maintenance workplaces for novoltage status works
Reference detailMelbourne Kew DepotMelbourne AUS2007 tramOCL

Material supply of overhead contact line line in depot

Reference detailProsmykyProsmyky CZE2007 railOCL

Elektroline a.s. was responsible for delivery and installing of material for   overhead contact line. (work place - Prosmyky )

Reference detailSenec - SladkovicovoSenec, Sladkovicovo SVK2007 railOCL

Delivery and installation:

  • Elektroline a.s. was responsible for delivery and installing of material for overhead contact line.
Reference detailAdelaideAdelaide AUS 2006
 2007
 tramOCL

Material supply for 5 km TRAM track; Cooperation on the project together with SKM company.

Reference detailLecceLecce ITA 2006
 2007
 tbusOCL

Material supply of over-head contact line - 12 km double track, including TBUS switches

Reference detailBordeauxBordeaux FRA2006 tramOCL

Assembly and installation at the project of Expansion of current tramway depot

Reference detailLyonLyon FRA2006 tramOCL

Assembly of new tramway line (8 km) LEA, crossover signalling over TRAM line

Reference detailIntersection L1/L2Montpellier FRA2006 tramOCL

Assembly of new TRAM line L2

Reference detailLyon tbus VETRA SystemLyon FRA 2005
 2006
 tbusOCL
SIG

Elektroline a.s. was responsible for delivery and installation of TBUS line,   including switches – Elektroline a.s. have installed the “VETRA” system with automatic setting of the whole trolleybus itinerary.

Reference detailCagliariCagliari ITA 2004
 2006
 tramOCL

Material supply for tram line including assmebly of OCL

Reference detailTram line SokolovskaPrague CZE2005 tramOCL

Elektroline supplied material and carried out the assembly of tram overhead contact line in total length of 1700 m double track:

  • tensioning mechanism system
  • automatic heating of switches system
  • GRP cantilevers
  • insulators and section insulators
  • supporting and tensioning equipment
  • other OCL clamps and fitting material
Reference detailTRAM line HanychovLiberec CZE 2000
 2005
 tramOCL

Elektroline company supplied material and made installation of new tram line in total length of 3000 m double track:

  • catenary system of OCL
  • automatic heating of switches system
  • TMPK switch point control systems 
  • GRP cantilevers
  • tensioning mechanism systems
  • insulators and section insulators
  • supporting and tensioning equipment
  • other OCL clamps and fitting material


Reference detailBendigoBendigo AUS2004 tramSIG

Delivery and installation:


  • Switch point control systems (2 switch points)

Maintenance:


  • Nonstop online support by trained Elektroline personnel





Reference detailMelbourneMelbourne AUS2004 tramOCL
SIG

Delivery and installation:


  • Switch point control system (1 switch point)
  • Material delivery for Overhead Contact Line
  • Nonstop online support by trained Elektroline personnel



Reference detailCeskomoravskaPrague CZE2004 tramOCL
SIG

Material supply, construction of the TRAM line including automatic TRAM switches control

Reference detailTram Depot PankracPrague CZE2004 tramSIG

Delivery and Installation:

  • Automatic control system of depot
  • Switch point heating
  • Overhead contact lines
  • Nonstop online support by Elektroline staff

Reference:

 ''(...) This system works to entire satisfaction of the client and without defects. In the depot, there are parked and get maintenined 136 trams. Elektroline also participates on gradual modernizing and automation of operation controlling in other depots where new systems of automatic operation controlling are being introduced. (...)''

Reference detailBergenBergen NOR 2003
 2004
 tbusOCL

Material supply, assmebly of TBUS line including crosses and switches

Reference detailOpavaOpava CZE 2003
 2004
 tbusOCL

Material supply, assmebly of TBUS line including crosses and switches

Reference detailBarrandovPrague CZE 2002
 2004
 tramOCL

Material supply, construction of the TRAM line including automatic TRAM switch control

Reference detailSzegedSzeged HUN 2002
 2004
 tbusOCL

Material supply, site management in assembly of TBUS switches

Reference detailTallinnTallinn EST 1998
 2004
 tramSIG

Material supply, site management, assmebly of TRAM switches control

Reference detailChietiChieti ITA 2002
 2003
 tbusOCL

Material supply, site management in assembly of TBUS switches

Reference detailMoscow DepotMoscow RUS 2001
 2003
 tramSIG

Material supply, assmebly of automatic TRAM switches control system in depot

Reference detailTimisoaraTimisoara ROU 2001
 2003
 tramOCL

Material supply, assembly of new of TRAM line

Reference detailKrakowKrakow POL 1999
 2003
 tramOCL

Material supply for TRAM lines

Reference detailGdanskGdansk POL 2000
 2001
 tramOCL

Material supply for TRAM lines

Items per page: 15 30 50 all 

 

 