english
česky
   

Page: 1 2 3 (1-50/126)

 project
city
country
period

scope
description  
Reference detailPoznanPoznan POL 2010
 2017
 tramSIG

Delivery and installation of signaling systems including signaling components, especially:

  • point machine TSH 106 LC (SIL3) - 86 pcs
  • point machine mechanical - 71 pcs
  • control system TSC (SIL3)
  • signal lamp
Reference detailPlzen - signaling projectsPlzen CZE 2009
 2017
 tramSIG

Delivery and installation:

  • Switch point control systems TSC (SIL 3)
  • Point machines (electro-hydraulic) - 60 pcs 
  • Point machines (mechanical) - 2 pcs
  • Radio communication system (VETRA communciation)
  • Automatic switch point heating
  • Point position indicators
  • Periodic maintenance by trained Elektroline personnel
Reference detailBrusselsBrussels BEL 2007
 2017
 tramSIG

Delivery and installation:


  • Point machines (more than 150 pcs of electro-hydraulic and over 200 of mechanical); 
  • Nonstop online support by trained Elektroline personnel



Reference detailBydgoszczBydgoszcz POL 2007
 2017
 tramSIG

Delivery and installation of signaling systems including signaling components, especially:

  • point machine TSH 106 LC (SIL3) - 40 pcs
  • mechanical point machine - over 40 pcs
Reference detailSpinozaweg – Molenvliet tram line reconstructionRotterdam NLD2016 tramOCL

Renovation of tramway track.

  • Replacement of current tensioning mechanism by Tensorex tension mechanism
  • Disconnectors replacement
  • Installation of surge arresters
  • Regulation of OCL
  • Poles anchoring
  • Dismantling of old and installation of new OCL
  • section insulators replacement
Reference detailReconstruction of the station Horažďovice předměstíHorazdovice predmesti CZE 2015
 2016
 railOCL
SIG

Elektroline a.s. was responsible for complete delivery and assembly overhead contact line system 25 kV AC (ARCAS-EL); remote control of sectional disconnectors; low and medium voltage technologies, railway station lighting; delivery and assembly substations 27/2x0,2 kV for station interlocking systems, 25/0,4 kV for electric heating systems and 25/3kV for electrical pre-heating equipment for railway vehicles and wagons, delivery and assembly of electric switch heating system (ESHS) and remote control and monitoring of railway station lighting and ESHS at the station Horažďovice předměstí.

Reference detailRevitalization of the railway Trutnov – Teplice nad Metují Adrspach CZE2015 railSIG

Elektroline a.s. was responsible for complete delivery and assembly of automatic Electrical Heating of Switches System (EHS) at the station Adršpach and remote control and monitoring from station Teplice nad Metují.

Reference detailVojvode Stepe ReconstructionBelgrade SRB2015 tramOCL

Delivery of overhead contact line material for the reconstruction of tram catenary track in length of 3.5 km. 

Reference detailDevelopment of the ecological transport in municipality CraiovaCraiova ROU2015 tramOCL

Scope of work performed by Elektroline:

  • full installation of Tramway overhead contact network in total length of 15,6 km single line
  • Installation of overvoltage protection for the OCL 
  • delivery of OCL material
Reference detailReconstruction of the railway Klatovy – Železná Ruda Klatovy – Zelezna Ruda  CZE2015 railSIG

Elektroline a.s. was responsible for complete delivery and assembly of automatic Electrical Heating of Switches System (EHS) in 6 railway stations (Janovice nad Úhlavou, Nýrsko, Zelená Lhota, Hamry - Hojsova Stráž, Špičák, Železná Ruda – Alžbětín), and remote control and monitoring from station Železná Ruda - Alžbětín

Reference detailRehabilitation of Tramway route 101Ploiesti ROU2015 tramOCL

Increasing of public transport mobility by rehabilitation of tramway route 101 with works targeting the railway, stations with platforms adapted for persons with disabilities, tramways, elements for traffic signalization and automatization – phase II

Scope of work performed by Elektroline:

  • full installation of Tramway overhead contact network in total length of 7,7 km single line.
  • installation of overvoltage protection for the OCL
  • delivery of OCL material


Reference detailStara Zagora TBUS Switches VETRA LightStara Zagora BGR2015 tbusOCL
SIG

Delivery of trolleybus switches with VETRA Light Technology including vehicle equipment (assembly and supervision).

Reference detailTunis Marine Terminal Tunis TUN2015 tramSIG

Delivery yof SIL3 signaling and automatic control system (via TWC) for two electrical switch points at Terminus station (entry and exit to the depot); 14 pcs of resonant truck circuits; remote dispatcher office

Reference detailMelbourne (Control Systems)Melbourne AUS 2014
 2015
 tramSIG

Elektroline has installed tramway switch control systems (tramway signaling system) within Melbourne tramway network including BRC resonant track circuits for fail-safe detection of trams.

Within the time period since June 2014 till June 2015, Elektroline has delivered in total 12 switch control systems (TSC type, SIL3 safety level).

Reference detailInfrastracture Design and Overhead contact Line (Tramline nr. 4)Tallinn EST 2014
 2015
 tramOCL

Elektroline a.s. was responsible for the whole part of tramway catenary system, i. e. for design OCL, delivery of all the material of overhead contact line system, and its assembly.

Reference detailÚsti nad OrlicíÚsti nad Orlicí CZE 2013
 2015
 railOCL

Elektroline Inc. was responsible for delivery and assembly of overhead contact line system, remote control of sectional disconnectors, high-voltage substation, lithing in pedestrian underpass, heavy current wiring, electrical heating of switches and more.

Reference detailElektričková trať Dúbravka v úseku Hanulova - Pri krížiBratislava SVK2014 tramSIG

Delivery and installation of Electro-hydraulic point machine including control system TSC Tandem. We also installed electrical heating of switches and vehicle departure control from turnabout.

Reference detailBaross square projectBudapest HUN2014 tbusOCL

Delivery of TBUS OCL material for trolleybus track e.g. cantilevers, section insulators, curve clamps, crossings, etc. We also supervised the assembly of tbus line. 

Reference detailViale AmendolaLa Spezia ITA2014 tbusOCL

Dismantle of current cantilevers and delivery and installation of new cantilevers incl. suspended OCL material for trolleybus track.

Reference detailTrojsky mostPrague CZE2014 tramOCL

We were responsible for delivery and installation of OCL poles as well as for delivery and assembly of overhead contact line on the bridge and at the surrounding area. We also made special preparation work for the priority of the tram vehicles.

Reference detailIbrahimli Extension and Depot KaratasGaziantep TUR 2013
 2014
 tramSIG

In scope of the project following parts were delivered and put ino operation:

  • electro-hydraulic point machines (24 pcs, with option for another 13 pcs in the future) within the depot
  • electro-hydraulic point machines (12 pcs) on intersections within the city
  • resonant track circuits
  • VETRA communication system (trackside elements) bidirectional communication system between trams and trackside systems
  • necessary hardware + software for automatic setting of tram routes within the depot
  • whole signalisation for tram drivers (traffic lights, point position indicators)
  • computer - client station with visualization of the depot and with possibility to control it
Reference detailNew TBUS DepotPilsen CZE 2013
 2014
 tbusOCL
SIG

We carried out delivery and installation of overhead contact systems for new trolleybus depot, as well as delivery and installation of automatic system for switches operation (VETRA) including all related software and computer for dispatching room. The project include e.g.:


  • 26 sets of electric switches
  • 26 sets of mechanical switches
  • 102 pcs of section insulators
  • 44 pcs of disconnectors

"Our company was pleased and fully satisfied with quality level of executed works as well as with the professional team involved in this project. Taking into consideration the above mentioned we would like to recommend Elektroline a.s. as an excellent option for executing of the OCL systems work".

Reference detailLyon TBUS line C13Lyon FRA 2012
 2014
 tbusOCL

We partly delivered material for the track and completely assembly of tbus track C13 in Lyon.


Due to very high trafic and important lines and rotes in direction of Lyon airport in this part of Lyon whole track was totally assembled at night hours.

Reference detailLinea 31Milano ITA 2012
 2014
 tramOCL

Delivery of material for TRAM line incl. diode section insulators.

Reference detailMetrocagliari, line 3 Gottardo - PoliclinicoCagliari ITA 2011
 2014
 tramOCL

Delivery of material and assembly of new double track TRAM line which is placed on the 2km-long viaduct. We also made a connection with the substation and partly adjustment at nerby depot.

Reference detailTRAM Warsaw ProjectsWarsaw POL 1999
 2014
 tramOCL
SIG

Elektroline was responsible for delivery of TRAM OCL material and signaling components for the Warszawa city. We supplied especially following products:

  • TMPK and TSC control systems (more than 200 pcs)
  • signaling lamps
  • sleeves and pole fastening
  • supporting and tensioning equipment 
  • section insulators and OCL insulators
  • GRP cantilevers and their components
  • contact wire clamps
  • tensioning mechanism and weights
  • disconnectors
  • suspensions and various OCL holders


Reference detailGeneral OCS & SIGNALING Delivery for PraguePrague CZE 1992
 2014
 tramOCL
SIG

More than 20 years cooperation (assembly & installations, material delivery and regular maintainance of our signaling devices, electro-revisions) with Prague Transport Authority. We have delivered and installed e.g.:

SIGNALING:

  • Automatic control system for switches (more than 220 pcs)
  • Automatic heating system for switchpoints

OCL SYSTEMS:

  • TRAM section insulators
  • TRAM disconnectors
  • GRP cantilevers
  • Components for cantilevers
  • contact wire clamps 
  • tensioning mechanism
Reference detailMetrocagliari, Gottardo-Settimo San PietroCagliari ITA2013 tramOCL

Delivery of OCL material for tram track.

Reference detailTramvajová trať Nové Sady - část BOlomouc CZE2013 tramOCL

Delivery of material and assembly of new tram line. We also delivered equipment for heating of switches.

Reference detailTest TrackPilsen CZE2013 railOCL

Elektroline Inc. was responsible for designing, delivery and assembly of overhead contact line system (ARCAS-EL) incl. technology for detection and signalization of traction voltage level in contact line system in range of DC 0,6 – 4 kV, AC 15 kV 16 2/3 Hz, AC 25 kV 50 Hz.  


Reference detailRenovation of MarconipleinRotterdam NLD2013 tramOCL

Delivery of OCL material for tramway track.

Reference detailGold Coast Light RailGold Coast AUS 2012
 2013
 tramOCL

Delivery of the complete system of over head contact line material for 13km light trail track.

Reference detailAssembly of tbus switchesLa Spezia ITA 2012
 2013
 tbusOCL

Assembly and material delivery of electrical tbus switches including control systems. We also delivered other OCL material for tbus track.

Reference detailTrolejbus Karolina 1. etapa TVOstrava CZE 2012
 2013
 tbusOCL

Installation and delivery of OCL material (including electrical switches and control systems, tbus crossings, disconnectors, etc.) for TBUS line.

Reference detailFranowo DepotPoznan POL 2012
 2013
 tramSIG

In this project we are/were responsible for these deliveries and installations:

  • Automatic control system of depot
  • software & visualization for movement of vehicles within the depot
  • 42 pcs of electro-hydraulic point machines
  • 39 pcs of mechanical point machines
  • 95 pcs of resonant track circuits
  • other material and equipment: tram detection elements, signaling lamps, etc.
Reference detailRevitalisatie Nieuwe BinnenwegRotterdam NLD 2012
 2013
 tramOCL

Delivery of OCL material for tramway track and public lightning

Reference detailMalenovice - Otrokovice C440 TVMalenovice - Otrokovice CZE 2011
 2013
 tbusOCL

Installation and delivery of OCL material for TBUS line.

Reference detailPassage through rail. junction Plzen in direction of the 3rd Transit Rail. corridorPilsen CZE 2011
 2013
 railOCL

Elektroline Inc. was responsible for delivery and assembly of railway overhead contact line system (ARCAS-EL).

Reference detailVidin Bridge II, Vidin Calafat, Part: Catenary, Part: ElektricityVidin BGR 2011
 2013
 railOCL
SIG

Elektroline Inc. was responsible for delivery and assembly of railway overhead contact line system (ARCAS) incl. remote control of sectional disconnectors.


Elektroline Inc. was responsible for delivery and assembly of electricity on the Bridge – LV and MV technology  incl. cabling, bridge highway and architecture lighting, power station 20/0,4 kV and bridge lightning protection.


Reference detailAssembly of tbus line - Burgers' ZOO projectsArnhem NLD2012 tbusOCL

Assembly of single track tbus line in lenght of 1.5km including end loop at Burgers' ZOO entry area. We also designed and delivered one complete set of tbus crossing 85° with insulation in both passing directions. Assembly of two complete sets of disconnectors including automatic power supply disconnecting control and further we also delivered the signalling of no voltage status.

Reference detailOCL repair of lightrail track in BergenBergen NOR2012 tramOCL

Delivery of OCL material and adjustment of 10 kms lightrailtrack. Especially reparation and contact wire stagger adjustment of lightrail track (10kms) in tunnel.

Reference detailGhent Langevelden level crossing signaling systemGhent BEL2012 tramSIG

Description of responsibilities:

  • SIL3 signaling system for tramway level crossing
  • SIL3/SIL2 resonant track circuits
Reference detailGothenburg tram lineGothenburg SWE2012 tramOCL

Delivery of OCL material for tram line.

Reference detailReconstruction of tram lineKharkov UKR2012 tramOCL

Supervision and delivery of material for reconstruction of tram line just beside stadium of EURO 2012 Chamionship. We delivered mainly:

  • disconnectors
  • cantilevers up to 9m 
  • section insulators
  • tensioning mechanism
  • exchange field
  • contact wire clamps, etc
Reference detailRondo im. Janusza KrupskiegoLublin POL2012 tbusOCL

Delivery of overhead contact line material for tbus track including electrical switches, mechanical switches, cantilevers and diode insulators. Installation of VETRA system into the vehicles.

Reference detailTBUS trať: U trati - Borská v Plzni II, etapa Doudlevecká - SirkovaPlzen CZE2012 tbusOCL

Construction of tbus alternate roadincluding two crossroads. We was responsible for delivery and installation of tbus crossing or tbus switches controlled by VETRA system.

Reference detailInstalation of TBUS switchesLyon FRA 2011
 2012
 tbusOCL

Inspection and installation improvement of trolleybus switches, trolleybus crossings and other OCL equipment including improvement of tbus roundabout on the line C1/C2.

Reference detailNew Palermo TRAM linePalermo ITA 2011
 2012
 tramOCL

Delivery of the OCL material for new tram line and for two tram depots (Rocella depot, Leonardo depot).

Reference detailDanube Bridge and Adjoining Infrastructure ProjectVidin BGR 2009
 2012
 railOCL

Delivery and installation of electrical and OCL equipment including ARCAS system (15 km). Our main responsibility in the project is to build complete over-head contact line for rail traffic, illumination of railway stations & nearby road overpasses and traction substation 27,5 kV.


Danube Bridge and Adjoining Infrastructure Project is very significant rail-route construction in region of Eastern Europe. This bridge will become new transit connection between Bulgaria (Vidin) and Romania (Calafat). Until now it was not possible to cross the Danube River another way than by the ferry or hundreds kilometers far away bridges. It will be changed within several months. The importance of the bridge also consists in that matter it connects rail as well as road traffic. Our main responsibility in the project is to build complete over-head contact line for rail traffic, illumination of railway stations and traction substation 27,5 kV. We are very glad we can be part of such a project.  


Reference detailRegulation of OCLBergen NOR2011 tramOCL

Delivery of OCL material for regulation of OCL high. Regulation of overhead contact line (catenary system) in horizontal and also in vertical direction. Assembly in total length of 1800m double track including 700m in tunnel.

Items per page: 15 30 50 all 

 

 

  [ ][ exchange ][ from Elektroline ]

english

There is a support for other languages to provide item names and other important information of minicatalogue and complete sets sections in national languages.