english
česky
   

Page: 1 2 3 4 5 6 7 8 9 (1-15/131)

 project
city
country
period

scope
description  
Reference detailRepair of power equipment in the station ÚpořinyÚpořiny 2017 railSIG

Elektroline a.s. was responsible for complete delivery and assembly of automatic Electrical Heating of Switches System (EHS), power station 22/0,4kV and backup generator at the station Úpořiny.

Reference detailPilsen - 1st part, Reconstruction of the Prague gridironPilsen  2014
 2017
 railOCL

Elektroline a.s. was responsible for complete delivery and assembly overhead contact line system 25 kV AC (ARCAS-EL) in the station Plzeň - main station.

Reference detailReconstruction of railway line section between Ostrov nad Oslavou – Žďár nad Sázavou Žďár nad Sázavou 2016 railOCL

Elektroline a.s. was responsible for complete delivery and assembly overhead contact line system 25 kV AC (ARCAS-EL) in the section between Ostrov nad Oslavou and Žďár nad Sázavou

Reference detailMelbourne (Control Systems)Melbourne AUS 2014
 2015
 tramSIG

Elektroline has installed tramway switch control systems (tramway signaling system) within Melbourne tramway network including BRC resonant track circuits for fail-safe detection of trams.

Within the time period since June 2014 till June 2015, Elektroline has delivered in total 12 switch control systems (TSC type, SIL3 safety level).

Reference detailGold Coast Light RailGold Coast AUS 2012
 2013
 tramOCL

Delivery of the complete system of over head contact line material for 13km light trail track.

Reference detailMelbourne, track circuitsMelbourne AUS2011 tramSIG

Delivery and installation:

  • Delivery of fail-safe track circuits BRC for detecting presence of a tram within tram stops
  • Including GSM communication module for remote diagnostics of the system
Reference detailMelbourne Kew DepotMelbourne AUS2007 tramOCL

Material supply of overhead contact line line in depot

Reference detailAdelaideAdelaide AUS 2006
 2007
 tramOCL

Material supply for 5 km TRAM track; Cooperation on the project together with SKM company.

Reference detailBendigoBendigo AUS2004 tramSIG

Delivery and installation:


  • Switch point control systems (2 switch points)

Maintenance:


  • Nonstop online support by trained Elektroline personnel





Reference detailMelbourneMelbourne AUS2004 tramOCL
SIG

Delivery and installation:


  • Switch point control system (1 switch point)
  • Material delivery for Overhead Contact Line
  • Nonstop online support by trained Elektroline personnel



Reference detailSalzburgSalzburg AUT2009 tbusOCL

Delivery and installation:

  • Delivery of electrical and mechanical switches for trolley-bus track
  • Delivery of TBUS x TRAIN crossing where the vehicles can passage through with current in both ways (both trolley-bus as well as train)


Reference detailBrusselsBrussels BEL 2007
 2017
 tramSIG

Delivery and installation:


  • Point machines (more than 150 pcs of electro-hydraulic and over 200 of mechanical); 
  • Nonstop online support by trained Elektroline personnel



Reference detailGhent Langevelden level crossing signaling systemGhent BEL2012 tramSIG

Description of responsibilities:

  • SIL3 signaling system for tramway level crossing
  • SIL3/SIL2 resonant track circuits
Reference detailGhent, Switch pointGhent BEL 2008
 2010
 tramSIG


Delivery and Installation:
  • Switch point control system
  • Point machine (electro-hydraulic)
Nonstop online support by trained Elektroline staff






Reference detailStara Zagora TBUS Switches VETRA LightStara Zagora BGR2015 tbusOCL
SIG

Delivery of trolleybus switches with VETRA Light Technology including vehicle equipment (assembly and supervision).

Items per page: 15 30 50 all 

 

 

  [ WEBMAIL ][ exchange (https://remote.elektroline.cz/owa) ][ from Elektroline (https://10.0.0.2/owa) ]

english

There is a support for other languages to provide item names and other important information of minicatalogue and complete sets sections in national languages.