english
česky
   

[x] Cancel data filter
Page: 1 (1-4/4)

 project
city
country
period

scope
description  
Reference detailPilsen - 1st part, Reconstruction of the Prague gridironPilsen CZE 2014
 2017
 railOCL

Elektroline a.s. was responsible for complete delivery and assembly overhead contact line system 25 kV AC (ARCAS-EL) in the station Plzeň - main station.

Reference detailNew TBUS DepotPilsen CZE 2013
 2014
 tbusOCL
SIG

We carried out delivery and installation of overhead contact systems for new trolleybus depot, as well as delivery and installation of automatic system for switches operation (VETRA) including all related software and computer for dispatching room. The project include e.g.:


  • 26 sets of electric switches
  • 26 sets of mechanical switches
  • 102 pcs of section insulators
  • 44 pcs of disconnectors

"Our company was pleased and fully satisfied with quality level of executed works as well as with the professional team involved in this project. Taking into consideration the above mentioned we would like to recommend Elektroline a.s. as an excellent option for executing of the OCL systems work".

Reference detailPilsen - Test TrackPilsen CZE2013 railOCL

Elektroline Inc. was responsible for designing, delivery and assembly of overhead contact line system (ARCAS-EL) incl. technology for detection and signalization of traction voltage level in contact line system in range of DC 0,6 – 4 kV, AC 15 kV 16 2/3 Hz, AC 25 kV 50 Hz.  


Reference detailPassage through rail. junction Plzen in direction of the 3rd Transit Rail. corridorPilsen CZE 2011
 2013
 railOCL

Elektroline Inc. was responsible for delivery and assembly of railway overhead contact line system (ARCAS-EL).

Items per page: 15 30 50 all 

 

 

  [ WEBMAIL ][ exchange (https://remote.elektroline.cz/owa) ][ from Elektroline (https://10.0.0.2/owa) ]

english

There is a support for other languages to provide item names and other important information of minicatalogue and complete sets sections in national languages.