english
česky
   

[x] Cancel data filter
Page: 1 (1-3/3)

 project
city
country
period

scope
description  
Reference detailBrusselsBrussels BEL 2007
 2017
 tramSIG

Delivery and installation:


  • Point machines (more than 150 pcs of electro-hydraulic and over 200 of mechanical); 
  • Nonstop online support by trained Elektroline personnel



Reference detailGhent Langevelden level crossing signaling systemGhent BEL2012 tramSIG

Description of responsibilities:

  • SIL3 signaling system for tramway level crossing
  • SIL3/SIL2 resonant track circuits
Reference detailGhent, Switch pointGhent BEL 2008
 2010
 tramSIG


Delivery and Installation:
  • Switch point control system
  • Point machine (electro-hydraulic)
Nonstop online support by trained Elektroline staff






Items per page: 15 30 50 all 

 

 

  [ WEBMAIL ][ exchange (https://remote.elektroline.cz/owa) ][ from Elektroline (https://10.0.0.2/owa) ]

english

There is a support for other languages to provide item names and other important information of minicatalogue and complete sets sections in national languages.