english
česky
   

[x] Cancel data filter
Page: 1 (1-3/3)

 project
city
country
period

scope
description  
Reference detailIbrahimli Extension and Depot KaratasGaziantep TUR 2013
 2014
 tramSIG

In scope of the project following parts were delivered and put ino operation:

  • electro-hydraulic point machines (24 pcs, with option for another 13 pcs in the future) within the depot
  • electro-hydraulic point machines (12 pcs) on intersections within the city
  • resonant track circuits
  • VETRA communication system (trackside elements) bidirectional communication system between trams and trackside systems
  • necessary hardware + software for automatic setting of tram routes within the depot
  • whole signalisation for tram drivers (traffic lights, point position indicators)
  • computer - client station with visualization of the depot and with possibility to control it
Reference detailGaziantep DepotGaziantep TUR 2010
 2011
 tramSIG

Delivery and installation of signaling systems and components:

  • semi-automatic depot control system
  • VETRA tram-to-way side communication system
  • tram priority system
  • point machines (electro-hydraulic and mechanical)
Reference detailIstanbulIstanbul TUR 2006
 2008
 tramOCL


Material supply for LIGHT RAIL LINE.



Items per page: 15 30 50 all 

 

 

  [ WEBMAIL ][ exchange (https://remote.elektroline.cz/owa) ][ from Elektroline (https://10.0.0.2/owa) ]

english

There is a support for other languages to provide item names and other important information of minicatalogue and complete sets sections in national languages.