Page: 1 (1-22/22)

 project
city
country
period

scope
description  
Reference detailBrusselsBrussels BEL 2007
 2017
 tramSIG

Delivery and installation:


  • Point machines (more than 150 pcs of electro-hydraulic and over 200 of mechanical); 
  • Nonstop online support by trained Elektroline personnel



Reference detailBydgoszczBydgoszcz POL 2007
 2017
 tramSIG

Delivery and installation of signaling systems including signaling components, especially:

  • point machine TSH 106 LC (SIL3) - 40 pcs
  • mechanical point machine - over 40 pcs
Reference detailTRAM Warsaw ProjectsWarsaw POL 1999
 2014
 tramOCL
SIG

Elektroline was responsible for delivery of TRAM OCL material and signaling components for the Warszawa city. We supplied especially following products:

  • TMPK and TSC control systems (more than 200 pcs)
  • signaling lamps
  • sleeves and pole fastening
  • supporting and tensioning equipment 
  • section insulators and OCL insulators
  • GRP cantilevers and their components
  • contact wire clamps
  • tensioning mechanism and weights
  • disconnectors
  • suspensions and various OCL holders


Reference detailGeneral OCS & SIGNALING Delivery for PraguePrague CZE 1992
 2014
 tramOCL
SIG

More than 20 years cooperation (assembly & installations, material delivery and regular maintainance of our signaling devices, electro-revisions) with Prague Transport Authority. We have delivered and installed e.g.:

SIGNALING:

  • Automatic control system for switches (more than 220 pcs)
  • Automatic heating system for switchpoints

OCL SYSTEMS:

  • TRAM section insulators
  • TRAM disconnectors
  • GRP cantilevers
  • Components for cantilevers
  • contact wire clamps 
  • tensioning mechanism
Reference detailMilanMilan ITA 2007
 2011
 tbusOCL

Material supply, site management in assembly of electrical TBUS switches. 

  • delivery of 40 complete sets of electrical switches with radio remote control
Reference detailGoteborg tramway signalingGöteborg SWE 2005
 2011
 tramSIG

Delivery:

  • track circuits BRC (new generation safety assessed track circuits)
  • point position indicators, custom-made signals
  • mechanical point machine TSM series


Reference detailSpain TRAM ProjectsTenerife and other ESP 2005
 2011
 tramOCL

Elektroline was responsible for delivery of TRAM OCL material to the Spain cities, e.g. Barcelona, Granada, Malaga, Murcia, Tenerife (Santa Cruz) de Tenerife), Zaragoza. We supplied especially following products:

  • sleeves and pole fastening
  • supporting and tensioning equipment 
  • section insulators and OCL insulators
  • GRP cantilevers and their components
  • contact wire clamps
  • tensioning mechanism and weights
  • disconnectors
  • suspensions and various OCL holders
Reference detailPardubice TBUS ProjectsPardubice CZE 1991
 2011
 tbusOCL
SIG


Continuous supplies of OCL material for trolley-buses including electrical and mechanical TBUS switches, tbus control systems for electrical switches, tbus crossings and other trolley-bus components. Supervision and assembly of OCL system and installation of feeding station.



Reference detailOlomouc Central Station AreaOlomouc CZE 2004
 2010
 tramOCL
SIG

Elektroline was responsible for delivery and installations of both OCL and signaling material such as:

  • tram OCL track assembly 
  • tram loop assembly
  • TSC (TMPKM) control system
  • signaling lamps
  • material for electrical heating of switches
  • GRP cantilevers
  • other OCL material
Reference detailTerminal Hradec KraloveHradec Kralove CZE 2007
 2008
 tbusOCL

Assembly and supervision of OCL and assembly of OCL in terminal as well. Installation of 17 sets electrical switches (suspended below system) incl. VETRA controlling and 18 sets of mechanical switches (suspended below system). Further assembly of 6 pcs of TBUS crossing.

Reference detailPrague main railway stationPrague CZE 2007
 2008
 railOCL
SIG

Elektroline a.s. was responsible for delivery and installing of material for electrical switch heating (including automatic control), railway station lighting (Prague).

Reference detailTramway line ŁódźŁódź POL 2007
 2008
 tramOCL

We delivered OCL material for tram line project (16 kms doubletrack), especially following material:

  • 55 mm GRP cantilevers and related 55mm armatures
  • disconnectors
  • devices for thermal compensation of contact wire (tension mechanism)
  • clamps and clips


Reference detailIstanbulIstanbul TUR 2006
 2008
 tramOCL


Material supply for LIGHT RAIL LINE.



Reference detailVologdaVologda RUS 2006
 2008
 tbusOCL

Material supply for trolley-bus track, especially:

  • electrical tbus switches 17 compl.
  • mechanical tbus switches 17 compl.
  • trolley-bus crossing 15 sets
Reference detailSofia control systemsSofia BGR 2005
 2008
 tramSIG

Elektroline Inc. has executed the delivery and installing of automatic control systems TMPKM for tram switches in the city of Sofia.


Items per page: 15 30 50 all 

 

 