Reference detailPoznanPoznan POL 2010
 2017
 tramSIG

Delivery and installation of signaling systems including signaling components, especially:

  • point machine TSH 106 LC (SIL3) - 86 pcs
  • point machine mechanical - 71 pcs
  • control system TSC (SIL3)
  • signal lamp
Reference detailPlzen - signaling projectsPlzen CZE 2009
 2017
 tramSIG

Delivery and installation:

  • Switch point control systems TSC (SIL 3)
  • Point machines (electro-hydraulic) - 60 pcs 
  • Point machines (mechanical) - 2 pcs
  • Radio communication system (VETRA communciation)
  • Automatic switch point heating
  • Point position indicators
  • Periodic maintenance by trained Elektroline personnel
Reference detailBrusselsBrussels BEL 2007
 2017
 tramSIG

Delivery and installation:


  • Point machines (more than 150 pcs of electro-hydraulic and over 200 of mechanical); 
  • Nonstop online support by trained Elektroline personnel



Reference detailBydgoszczBydgoszcz POL 2007
 2017
 tramSIG

Delivery and installation of signaling systems including signaling components, especially:

  • point machine TSH 106 LC (SIL3) - 40 pcs
  • mechanical point machine - over 40 pcs
Reference detailMetrocagliari, line 3 Gottardo - PoliclinicoCagliari ITA 2011
 2014
 tramOCL

Delivery of material and assembly of new double track TRAM line which is placed on the 2km-long viaduct. We also made a connection with the substation and partly adjustment at nerby depot.

Reference detailTRAM Warsaw ProjectsWarsaw POL 1999
 2014
 tramOCL
SIG

Elektroline was responsible for delivery of TRAM OCL material and signaling components for the Warszawa city. We supplied especially following products:

  • TMPK and TSC control systems (more than 200 pcs)
  • signaling lamps
  • sleeves and pole fastening
  • supporting and tensioning equipment 
  • section insulators and OCL insulators
  • GRP cantilevers and their components
  • contact wire clamps
  • tensioning mechanism and weights
  • disconnectors
  • suspensions and various OCL holders


Reference detailGeneral OCS & SIGNALING Delivery for PraguePrague CZE 1992
 2014
 tramOCL
SIG

More than 20 years cooperation (assembly & installations, material delivery and regular maintainance of our signaling devices, electro-revisions) with Prague Transport Authority. We have delivered and installed e.g.:

SIGNALING:

  • Automatic control system for switches (more than 220 pcs)
  • Automatic heating system for switchpoints

OCL SYSTEMS:

  • TRAM section insulators
  • TRAM disconnectors
  • GRP cantilevers
  • Components for cantilevers
  • contact wire clamps 
  • tensioning mechanism
Reference detailMalenovice - Otrokovice C440 TVMalenovice - Otrokovice CZE 2011
 2013
 tbusOCL

Installation and delivery of OCL material for TBUS line.

Reference detailPassage through rail. junction Plzen in direction of the 3rd Transit Rail. corridorPilsen CZE 2011
 2013
 railOCL

Elektroline Inc. was responsible for delivery and assembly of railway overhead contact line system (ARCAS-EL).

Reference detailVidin Bridge II, Vidin Calafat, Part: Catenary, Part: ElektricityVidin BGR 2011
 2013
 railOCL
SIG

Elektroline Inc. was responsible for delivery and assembly of railway overhead contact line system (ARCAS) incl. remote control of sectional disconnectors.


Elektroline Inc. was responsible for delivery and assembly of electricity on the Bridge – LV and MV technology  incl. cabling, bridge highway and architecture lighting, power station 20/0,4 kV and bridge lightning protection.


Reference detailInstalation of TBUS switchesLyon FRA 2011
 2012
 tbusOCL

Inspection and installation improvement of trolleybus switches, trolleybus crossings and other OCL equipment including improvement of tbus roundabout on the line C1/C2.

Reference detailNew Palermo TRAM linePalermo ITA 2011
 2012
 tramOCL

Delivery of the OCL material for new tram line and for two tram depots (Rocella depot, Leonardo depot).

Reference detailDanube Bridge and Adjoining Infrastructure ProjectVidin BGR 2009
 2012
 railOCL

Delivery and installation of electrical and OCL equipment including ARCAS system (15 km). Our main responsibility in the project is to build complete over-head contact line for rail traffic, illumination of railway stations & nearby road overpasses and traction substation 27,5 kV.


Danube Bridge and Adjoining Infrastructure Project is very significant rail-route construction in region of Eastern Europe. This bridge will become new transit connection between Bulgaria (Vidin) and Romania (Calafat). Until now it was not possible to cross the Danube River another way than by the ferry or hundreds kilometers far away bridges. It will be changed within several months. The importance of the bridge also consists in that matter it connects rail as well as road traffic. Our main responsibility in the project is to build complete over-head contact line for rail traffic, illumination of railway stations and traction substation 27,5 kV. We are very glad we can be part of such a project.  


Reference detailRegulation of OCLBergen NOR2011 tramOCL

Delivery of OCL material for regulation of OCL high. Regulation of overhead contact line (catenary system) in horizontal and also in vertical direction. Assembly in total length of 1800m double track including 700m in tunnel.

Reference detailMonserrato Depot in CagliariCagliari ITA2011 tramOCL

Supply and assembly of OCL material for electrical traction, for extension of existing power supply line to other tracks where the trams pass, in the area of depot and maintenance workshop, situated inside the location of Operation Head Office of Metro Cagliari in Monserrato.

Items per page: 15 30 50 all 

 

 

  [ WEBMAIL ][ exchange (https://remote.elektroline.cz/owa) ][ from Elektroline (https://10.0.0.2/owa) ]

english

There is a support for other languages to provide item names and other important information of minicatalogue and complete sets sections in national languages.