Reference detailTrolejové vedení ulice Vrchlického v JihlavěJihlava CZE2017 tbusOCL

New trolleybus line which created trasport connection among city outskirts and city center and city hospital. Project also incude three big crossroads (2 x T type and 1 x roundabout). 

Delivery and installations:

  • installation of 9 compl.sets of tbus electrical switch including radio transmitter 
  • installation of 9 compl.sets of tbus mechanicalswitch
  • installation of 9 tbus crossings
  • assembly of over 11 000m of contact wire
  • 1000m of feeding cables
Reference detailRepair of power equipment in the station ÚpořinyÚpořiny CZE2017 railSIG

Elektroline a.s. was responsible for complete delivery and assembly of automatic Electrical Heating of Switches System (EHS), power station 22/0,4kV and backup generator at the station Úpořiny.

Reference detailZawiercie-Borowe pole - Test TrackZawiercie-Borowe pole POL2017 railOCL

Elektroline Inc. was responsible for designing, delivery and assembly of overhead contact line system (ARCAS-EL) DC 3kV with two messenger wires and two contact wires.

Reference detailMultimodální uzel veřejné dopravy v PardubicíchPardubice CZE 2016
 2017
 tbusOCL

Jedná se o přednádražní prostor v Pardubicích. Nově bylo zatrolejováno nástupiště pro TBUS. Odborně byly instalovány moderní a lehké armatury společnosti Elektroline.

Materiál a instalace:

  • montáž 3 elektrických rádiových výhybek
  • montáž 3 mechanických výhybek
  • montáž 3 TBUS křížení
  • instalace 5850m trolejového drátu 
  • instalace napájecích kabelů v celkové délce 525m


Reference detailPilsen - 1st part, Reconstruction of the Prague gridironPilsen CZE 2014
 2017
 railOCL

Elektroline a.s. was responsible for complete delivery and assembly overhead contact line system 25 kV AC (ARCAS-EL) in the station Plzeň - main station.

Reference detailPoznanPoznan POL 2010
 2017
 tramSIG

Delivery and installation of signaling systems including signaling components, especially:

  • point machine TSH 106 LC (SIL3) - 86 pcs
  • point machine mechanical - 71 pcs
  • control system TSC (SIL3)
  • signal lamp
Reference detailPlzen - signaling projectsPlzen CZE 2009
 2017
 tramSIG

Delivery and installation:

  • Switch point control systems TSC (SIL 3)
  • Point machines (electro-hydraulic) - 60 pcs 
  • Point machines (mechanical) - 2 pcs
  • Radio communication system (VETRA communciation)
  • Automatic switch point heating
  • Point position indicators
  • Periodic maintenance by trained Elektroline personnel
Reference detailBrusselsBrussels BEL 2007
 2017
 tramSIG

Delivery and installation:


  • Point machines (more than 150 pcs of electro-hydraulic and over 200 of mechanical); 
  • Nonstop online support by trained Elektroline personnel



Reference detailBydgoszczBydgoszcz POL 2007
 2017
 tramSIG

Delivery and installation of signaling systems including signaling components, especially:

  • point machine TSH 106 LC (SIL3) - 40 pcs
  • mechanical point machine - over 40 pcs
Items per page: 15 30 50 all 

 

 

  [ WEBMAIL ][ exchange (https://remote.elektroline.cz/owa) ][ from Elektroline (https://10.0.0.2/owa) ]

english

There is a support for other languages to provide item names and other important information of minicatalogue and complete sets sections in national languages.