english
česky
   

Page: 1 2 3 4 5 6 7 8 9 (61-75/132)

 project
city
country
period

scope
description  
Reference detailMelbourne, track circuitsMelbourne AUS2011 tramSIG

Delivery and installation:

  • Delivery of fail-safe track circuits BRC for detecting presence of a tram within tram stops
  • Including GSM communication module for remote diagnostics of the system
Reference detailTram Depot BaggioMilan ITA2011 tramSIG

Delivery and installation:

  • Automatic control system of entrance to the depot 
  • Point machine (electro-hydraulic)
  • Resonant track circuits BRC (SIL 2 safety assessed)

Reference detailRNV- Linie 5 an der BergstraßeWeinheim DEU2011 tramOCL

Delivery of material for tram catenary track:

  • GRP cantilevers
  • components for cantilevers and other OCL material
  • insulators
Reference detailTRAM Depot LekstraatAmsterdam NLD 2010
 2011
 tramSIG

Project description:

  • semi-automatic depot control system
  • automatic washing management system
  • custom-made real-time visualization
  • including fail-safe track circuits BRC


Reference detailGaziantep DepotGaziantep TUR 2010
 2011
 tramSIG

Delivery and installation of signaling systems and components:

  • semi-automatic depot control system
  • VETRA tram-to-way side communication system
  • tram priority system
  • point machines (electro-hydraulic and mechanical)
Reference detailNew tram trackNorrköping SWE 2010
 2011
 tramOCL

Delivery of tram OCL components:

  • disconnectors including mechanical drives and their components
  • GRP cantilevers plus components for cantilevers
  • OCL clamps and holders
  • weights for movable anchorage
  • insulators
Reference detailMalenovice - OtrokoviceZlin CZE 2010
 2011
 tbusOCL

1st stage: Material supply and assembly of TBUS overhead contact line (cca 750 m), supply of traction cables (2900 m CW). Installation of disconnectors and poles (36 pcs)

2nd stage: Material supply of traction cables (1000 m), TBUS overhead contact line (1280 m), traction tube poles (88 pcs)

Reference detailBlackpool and Fleetwood tramway reconstructionBlackpool GBR 2009
 2011
 tramSIG

Delivery and installation:

  • Switch point control systems TSC (SIL 3)
  • Point machines (electro-hydraulic and mechanical)
  • Radio communication system (VETRA communciation)
  • Preference of trams at junctions (VETRA communication)

Reference detailreconstruction of tramway line 1-4Szeged HUN 2009
 2011
 tramOCL
SIG

Delivery and installation:

  • switch point control systems TSC
  • electro-hydraulic and mechanical point machines (TSH and TSM series)
  • automatic heating of switch points
  • systems for tram priority at traffic lights
  • tram-to-wayside communication system
  • various OCL parts


Reference detailUsti nad LabemUsti nad Labem CZE 2009
 2011
 railOCL

Delivery and installation:

Elektroline a.s. was responsible for delivery and assembly of material for overhead contact line, electrical heating of switches and pole lighting


Reference detailIII. transit corridor Stribro - PlanaStribro, Plana CZE 2008
 2011
 railOCL

ELEKTROLINE a.s. was responsible for delivery and installing of material for   lighting, remote control of disconnectors and remote control of switch heating and lighting

Reference detailSzeged Pulz DepotSzeged HUN 2008
 2011
 tramSIG


Delivery and installation:
  • Switch point control systems
  • Point machines (electro-hydraulic 106 NN and mechanical)
  • Switch point heating
  • Atypical intersection control system
  • Special control system for switch points in depot
  • Overhead Contact Line



Reference detailThe HagueThe Hague NLD 2008
 2011
 tramSIG

Delivery and installation:

  • switch point control systems (SIL 3)
  • point machines (electro-hydraulic)


Reference detailMilanMilan ITA 2007
 2011
 tbusOCL

Material supply, site management in assembly of electrical TBUS switches. 

  • delivery of 40 complete sets of electrical switches with radio remote control
Reference detailGoteborg tramway signalingGöteborg SWE 2005
 2011
 tramSIG

Delivery:

  • track circuits BRC (new generation safety assessed track circuits)
  • point position indicators, custom-made signals
  • mechanical point machine TSM series


Items per page: 15 30 50 all 

 

 

  [ WEBMAIL ][ exchange (https://remote.elektroline.cz/owa) ][ from Elektroline (https://10.0.0.2/owa) ]

english

There is a support for other languages to provide item names and other important information of minicatalogue and complete sets sections in national languages.