english
česky
   

Page: 1 2 3 4 5 6 7 8 9 (1-15/126)

 project
city
country
period

scope
description  
Reference detailTunis Marine Terminal Tunis TUN2015 tramSIG

Delivery yof SIL3 signaling and automatic control system (via TWC) for two electrical switch points at Terminus station (entry and exit to the depot); 14 pcs of resonant truck circuits; remote dispatcher office

Reference detailReconstruction of the railway Klatovy – Železná Ruda Klatovy – Zelezna Ruda  CZE2015 railSIG

Elektroline a.s. was responsible for complete delivery and assembly of automatic Electrical Heating of Switches System (EHS) in 6 railway stations (Janovice nad Úhlavou, Nýrsko, Zelená Lhota, Hamry - Hojsova Stráž, Špičák, Železná Ruda – Alžbětín), and remote control and monitoring from station Železná Ruda - Alžbětín

Reference detailRevitalization of the railway Trutnov – Teplice nad Metují Adrspach CZE2015 railSIG

Elektroline a.s. was responsible for complete delivery and assembly of automatic Electrical Heating of Switches System (EHS) at the station Adršpach and remote control and monitoring from station Teplice nad Metují.

Reference detailMelbourne (Control Systems)Melbourne AUS 2014
 2015
 tramSIG

Elektroline has installed tramway switch control systems (tramway signaling system) within Melbourne tramway network including BRC resonant track circuits for fail-safe detection of trams.

Within the time period since June 2014 till June 2015, Elektroline has delivered in total 12 switch control systems (TSC type, SIL3 safety level).

Reference detailElektričková trať Dúbravka v úseku Hanulova - Pri krížiBratislava SVK2014 tramSIG

Delivery and installation of Electro-hydraulic point machine including control system TSC Tandem. We also installed electrical heating of switches and vehicle departure control from turnabout.

Reference detailIbrahimli Extension and Depot KaratasGaziantep TUR 2013
 2014
 tramSIG

In scope of the project following parts were delivered and put ino operation:

  • electro-hydraulic point machines (24 pcs, with option for another 13 pcs in the future) within the depot
  • electro-hydraulic point machines (12 pcs) on intersections within the city
  • resonant track circuits
  • VETRA communication system (trackside elements) bidirectional communication system between trams and trackside systems
  • necessary hardware + software for automatic setting of tram routes within the depot
  • whole signalisation for tram drivers (traffic lights, point position indicators)
  • computer - client station with visualization of the depot and with possibility to control it
Reference detailFranowo DepotPoznan POL 2012
 2013
 tramSIG

In this project we are/were responsible for these deliveries and installations:

  • Automatic control system of depot
  • software & visualization for movement of vehicles within the depot
  • 42 pcs of electro-hydraulic point machines
  • 39 pcs of mechanical point machines
  • 95 pcs of resonant track circuits
  • other material and equipment: tram detection elements, signaling lamps, etc.
Reference detailGhent Langevelden level crossing signaling systemGhent BEL2012 tramSIG

Description of responsibilities:

  • SIL3 signaling system for tramway level crossing
  • SIL3/SIL2 resonant track circuits
Reference detailTram Depot BaggioMilan ITA2011 tramSIG

Delivery and installation:

  • Automatic control system of entrance to the depot 
  • Point machine (electro-hydraulic)
  • Resonant track circuits BRC (SIL 2 safety assessed)

Reference detailMelbourne, track circuitsMelbourne AUS2011 tramSIG

Delivery and installation:

  • Delivery of fail-safe track circuits BRC for detecting presence of a tram within tram stops
  • Including GSM communication module for remote diagnostics of the system
Reference detailReconstruction of Hnevice Railway StationHnevice CZE2011 railSIG

In this project Elektroline was responsible for delivery and installing of:

  • electric heating of switches reconstruction (23 pcs) of Horice station
  • remote control of electric heating of switches
  • construction of new distribution substation 22/0.4 kV plus its medium-voltage cable connection 22kV
Reference detailWestvest temporary terminusDelft NLD2011 tramSIG

Delivery and installation:

  • Delivery and installation of driver´s keyboard control system for electro-hydraulic point machine
  • Including electro-hydraulical point machine installed in ground box
Reference detailGaziantep DepotGaziantep TUR 2010
 2011
 tramSIG

Delivery and installation of signaling systems and components:

  • semi-automatic depot control system
  • VETRA tram-to-way side communication system
  • tram priority system
  • point machines (electro-hydraulic and mechanical)
Reference detailTRAM Depot LekstraatAmsterdam NLD 2010
 2011
 tramSIG

Project description:

  • semi-automatic depot control system
  • automatic washing management system
  • custom-made real-time visualization
  • including fail-safe track circuits BRC


Reference detailPlzen - signaling projectsPlzen CZE 2009
 2011
 tramSIG

Delivery and installation:

  • Switch point control systems TSC (SIL 3)
  • Point machines (electro-hydraulic)
  • Radio communication system (VETRA communciation)
  • Automatic switch point heating
  • Point position indicators
  • Periodic maintenance by trained Elektroline personnel
Items per page: 15 30 50 all 

 

 

  [ ][ exchange ][ from Elektroline ]

english

There is a support for other languages to provide item names and other important information of minicatalogue and complete sets sections in national languages.