Reference detailBordeauxBordeaux FRA2006 tramOCL

Assembly and installation at the project of Expansion of current tramway depot

Reference detailLyonLyon FRA2006 tramOCL

Assembly of new tramway line (8 km) LEA, crossover signalling over TRAM line

Reference detailIntersection L1/L2Montpellier FRA2006 tramOCL

Assembly of new TRAM line L2

Reference detailLyon tbus VETRA SystemLyon FRA 2005
 2006
 tbusOCL
SIG

Elektroline a.s. was responsible for delivery and installation of TBUS line,   including switches – Elektroline a.s. have installed the “VETRA” system with automatic setting of the whole trolleybus itinerary.

Reference detailCagliariCagliari ITA 2004
 2006
 tramOCL

Material supply for tram line including assmebly of OCL

Reference detailTram line SokolovskaPrague CZE2005 tramOCL

Elektroline supplied material and carried out the assembly of tram overhead contact line in total length of 1700 m double track:

  • tensioning mechanism system
  • automatic heating of switches system
  • GRP cantilevers
  • insulators and section insulators
  • supporting and tensioning equipment
  • other OCL clamps and fitting material
Reference detailTRAM line HanychovLiberec CZE 2000
 2005
 tramOCL

Elektroline company supplied material and made installation of new tram line in total length of 3000 m double track:

  • catenary system of OCL
  • automatic heating of switches system
  • TMPK switch point control systems 
  • GRP cantilevers
  • tensioning mechanism systems
  • insulators and section insulators
  • supporting and tensioning equipment
  • other OCL clamps and fitting material


Reference detailBendigoBendigo AUS2004 tramSIG

Delivery and installation:


  • Switch point control systems (2 switch points)

Maintenance:


  • Nonstop online support by trained Elektroline personnel





Reference detailMelbourneMelbourne AUS2004 tramOCL
SIG

Delivery and installation:


  • Switch point control system (1 switch point)
  • Material delivery for Overhead Contact Line
  • Nonstop online support by trained Elektroline personnel



Reference detailCeskomoravskaPrague CZE2004 tramOCL
SIG

Material supply, construction of the TRAM line including automatic TRAM switches control

Reference detailTram Depot PankracPrague CZE2004 tramSIG

Delivery and Installation:

  • Automatic control system of depot
  • Switch point heating
  • Overhead contact lines
  • Nonstop online support by Elektroline staff

Reference:

 ''(...) This system works to entire satisfaction of the client and without defects. In the depot, there are parked and get maintenined 136 trams. Elektroline also participates on gradual modernizing and automation of operation controlling in other depots where new systems of automatic operation controlling are being introduced. (...)''

Reference detailBergenBergen NOR 2003
 2004
 tbusOCL

Material supply, assmebly of TBUS line including crosses and switches

Reference detailOpavaOpava CZE 2003
 2004
 tbusOCL

Material supply, assmebly of TBUS line including crosses and switches

Reference detailBarrandovPrague CZE 2002
 2004
 tramOCL

Material supply, construction of the TRAM line including automatic TRAM switch control

Reference detailSzegedSzeged HUN 2002
 2004
 tbusOCL

Material supply, site management in assembly of TBUS switches