Reference detailTrolejové vedení ulice Vrchlického v JihlavěJihlava CZE2017 tbusOCL

New trolleybus line which created trasport connection among city outskirts and city center and city hospital. Project also incude three big crossroads (2 x T type and 1 x roundabout). 

Delivery and installations:

  • installation of 9 compl.sets of tbus electrical switch including radio transmitter 
  • installation of 9 compl.sets of tbus mechanicalswitch
  • installation of 9 tbus crossings
  • assembly of over 11 000m of contact wire
  • 1000m of feeding cables
Reference detailRepair of power equipment in the station ÚpořinyÚpořiny 2017 railSIG

Elektroline a.s. was responsible for complete delivery and assembly of automatic Electrical Heating of Switches System (EHS), power station 22/0,4kV and backup generator at the station Úpořiny.

Reference detailMultimodální uzel veřejné dopravy v PardubicíchPardubice CZE 2016
 2017
 tbusOCL

Jedná se o přednádražní prostor v Pardubicích. Nově bylo zatrolejováno nástupiště pro TBUS. Odborně byly instalovány moderní a lehké armatury společnosti Elektroline.

Materiál a instalace:

  • montáž 3 elektrických rádiových výhybek
  • montáž 3 mechanických výhybek
  • montáž 3 TBUS křížení
  • instalace 5850m trolejového drátu 
  • instalace napájecích kabelů v celkové délce 525m


Reference detailPilsen - 1st part, Reconstruction of the Prague gridironPilsen  2014
 2017
 railOCL

Elektroline a.s. was responsible for complete delivery and assembly overhead contact line system 25 kV AC (ARCAS-EL) in the station Plzeň - main station.

Reference detailPoznanPoznan POL 2010
 2017
 tramSIG

Delivery and installation of signaling systems including signaling components, especially:

  • point machine TSH 106 LC (SIL3) - 86 pcs
  • point machine mechanical - 71 pcs
  • control system TSC (SIL3)
  • signal lamp
Reference detailPlzen - signaling projectsPlzen CZE 2009
 2017
 tramSIG

Delivery and installation:

  • Switch point control systems TSC (SIL 3)
  • Point machines (electro-hydraulic) - 60 pcs 
  • Point machines (mechanical) - 2 pcs
  • Radio communication system (VETRA communciation)
  • Automatic switch point heating
  • Point position indicators
  • Periodic maintenance by trained Elektroline personnel
Reference detailBrusselsBrussels BEL 2007
 2017
 tramSIG

Delivery and installation:


  • Point machines (more than 150 pcs of electro-hydraulic and over 200 of mechanical); 
  • Nonstop online support by trained Elektroline personnel



Reference detailBydgoszczBydgoszcz POL 2007
 2017
 tramSIG

Delivery and installation of signaling systems including signaling components, especially:

  • point machine TSH 106 LC (SIL3) - 40 pcs
  • mechanical point machine - over 40 pcs
Reference detailSpinozaweg – Molenvliet tram line reconstructionRotterdam NLD2016 tramOCL

Renovation of tramway track.

  • Replacement of current tensioning mechanism by Tensorex tension mechanism
  • Disconnectors replacement
  • Installation of surge arresters
  • Regulation of OCL
  • Poles anchoring
  • Dismantling of old and installation of new OCL
  • section insulators replacement
Reference detailReconstruction of railway line section between Ostrov nad Oslavou – Žďár nad Sázavou Žďár nad Sázavou 2016 railOCL

Elektroline a.s. was responsible for complete delivery and assembly overhead contact line system 25 kV AC (ARCAS-EL) in the section between Ostrov nad Oslavou and Žďár nad Sázavou

Reference detailReconstruction of the station Horažďovice předměstíHorazdovice predmesti CZE 2015
 2016
 railOCL
SIG

Elektroline a.s. was responsible for complete delivery and assembly overhead contact line system 25 kV AC (ARCAS-EL); remote control of sectional disconnectors; low and medium voltage technologies, railway station lighting; delivery and assembly substations 27/2x0,2 kV for station interlocking systems, 25/0,4 kV for electric heating systems and 25/3kV for electrical pre-heating equipment for railway vehicles and wagons, delivery and assembly of electric switch heating system (ESHS) and remote control and monitoring of railway station lighting and ESHS at the station Horažďovice předměstí.

Reference detailRevitalization of the railway Trutnov – Teplice nad Metují Adrspach CZE2015 railSIG

Elektroline a.s. was responsible for complete delivery and assembly of automatic Electrical Heating of Switches System (EHS) at the station Adršpach and remote control and monitoring from station Teplice nad Metují.

Reference detailVojvode Stepe ReconstructionBelgrade SRB2015 tramOCL

Delivery of overhead contact line material for the reconstruction of tram catenary track in length of 3.5 km. 

Reference detailDevelopment of the ecological transport in municipality CraiovaCraiova ROU2015 tramOCL

Scope of work performed by Elektroline:

  • full installation of Tramway overhead contact network in total length of 15,6 km single line
  • Installation of overvoltage protection for the OCL 
  • delivery of OCL material
Reference detailReconstruction of the railway Klatovy – Železná Ruda Klatovy – Zelezna Ruda  CZE2015 railSIG

Elektroline a.s. was responsible for complete delivery and assembly of automatic Electrical Heating of Switches System (EHS) in 6 railway stations (Janovice nad Úhlavou, Nýrsko, Zelená Lhota, Hamry - Hojsova Stráž, Špičák, Železná Ruda – Alžbětín), and remote control and monitoring from station Železná Ruda - Alžbětín

Items per page: 15 30 50 all 

 

 

  [ WEBMAIL ][ exchange (https://remote.elektroline.cz/owa) ][ from Elektroline (https://10.0.0.2/owa) ]

english

There is a support for other languages to provide item names and other important information of minicatalogue and complete sets sections in national languages.